3
Installation
3.1 Installation Requirements
3.1.1 Upflow Layout Requirements
Figure 3-1 System layout diagram
(A) Chilled water inlet
(B) Chilled water outlet
(1) Balance valve or isolation
valve
(2) Water filter
(3) Isolation valve
(4) Flexible connection
(5) Chilled water valve
(6) Heat exchanger
(7) External components
NetCol8000-C(070, 130, 190) In-room Chilled Water
Smart Cooling Product
User Manual
3 Installation
Issue 07 (2021-12-30)
Copyright © Huawei Technologies Co., Ltd.
30