Step 6 Secure the outdoor fan cable using cable ties.
Step 7 Install the fan guard.
Step 8 Power on the equipment, choose Maintain > Performance Maintain on the home
screen to access the performance maintain screen, and clear the total runtime of
outdoor fan 1.
Step 9 Start the equipment and ensure that the smart cooling product works properly
and no alarm is raised.
----End
5.4.2.2 Replacing a Control Board
Prerequisites
●
A control board needs to be replaced.
●
A spare control board of the same model is available and functional.
Context
●
Tools: Phillips screwdriver, diagonal pliers, and cable tie.
●
Preparation: Power off the outdoor unit.
Procedure
Step 1 Turn off the indoor unit circuit breaker and circuit breaker in the power
distribution cabinet.
NO TICE
If the outdoor unit does not take the electricity from indoor unit, turn off the
circuit breaker for the outdoor unit.
Step 2 Remove the top cover and front upper panel using a Phillips screwdriver.
NetCol8000-A013 In-room Air Cooled Smart Cooling
Product
User Manual (600 mm Width)
5 System Operation and Maintenance
Issue 02 (2020-11-09)
Copyright © Huawei Technologies Co., Ltd.
116