Figure 3-16 Checking the nitrogen pressure (NetCol5000-C030/C032)
----End
Follow-up Procedure
Check that thermal insulation foam is in close contact with the pipes, there is no
crack in each cutting position, and the chilled water valve is tightly wrapped by
thermal insulation foam.
3.5 Removing the Pallet
3.5.1 Removing the Pallet (NetCol5000-C065)
Procedure
Step 1 Remove the connecting kit that secures the cabinet to the pallet from the bottom
of the two side panels of the cabinet, as shown in
.
NetCol5000-C(030, 032, 065) In-row Chilled Water
Smart Cooling Product
User Manual (2019)
3 Installation
Issue 03 (2020-08-30)
Copyright © Huawei Technologies Co., Ltd.
43