Figure 4-37
Installing an RHUB power cable
----End
4.5 Checking the RHUB Hardware Installation
After an RHUB is installed, check the installation of hardware including the devices and related
cables.
lists the hardware installation checking items.
Table 4-4
Hardware installation checking list
No.
Item
1
The position for each device conforms to the engineering design and meets the
space requirement.
2
Ensure that the RHUB is properly installed.
3
The surface of the RHUB is neat and clean. The external paint is intact. The labels,
tags, and nameplates are correct, legible, and complete.
lists the checking list of the power cable and PGND cable connections.
Table 4-5
Checklist for power cable and PGND cable connections
No.
Item
1
The power cables and PGND cables comply with the requirements of local
regulations.
LampSite
Installation Guide
4 Installing an RHUB
Issue 02 (2014-05-27)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
40