2.1 Reference Documents
Before the installation, you must read the following documents:
l
LampSite Hardware Description
l
Installation Reference
For details about how to install a baseband unit (BBU), see
DBS3900 Installation Guide
.
2.2 Preparing Tools and Instruments
This section describes the tools and instruments that must be prepared before the installation.
Marker
Level
Torque screwdriver
(M4 to M6)
Diagonal pliers
Power cable crimping tool
RJ11 crimping tool
Cable cutter
Rubber mallet
T20 torque torx screwdriver
Wire stripper
Hammer drill (Ø6,Ø8 and
Ø12)
Torque wrench (Ø10 mm)
Protective gloves
Guarded blade utility knife
ESD gloves
Long measuring tape
LampSite
Installation Guide
2 Installation Preparations
Issue 02 (2014-05-27)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
5