Figure 5-42
Installing adapter power cables
Step 4
4.4.1 Requirements for Cable Layout
----End
5.8 Checking the pRRU Hardware Installation
pRRU hardware installation checking includes hardware and cable installation checking.
lists the hardware installation checking items.
Table 5-8
Hardware installation checking list
No.
Item
1
Ensure that the pRRU is not grouned.
2
The position for each device conforms to the engineering design and meets the
space requirement.
3
Ensure that the pRRU is properly installed.
4
The surface of the pRRU is neat and clean. The external paint is intact. The labels,
tags, and nameplates are correct, legible, and complete.
lists the check items of the signal cable connection.
Table 5-9
Checklist for the signal cable connection
No.
Item
1
The connectors of the signal cables must securely connected.
2
The connectors of the signal cables are intact.
3
The signal cables are intact.
LampSite
Installation Guide
5 Installing a pRRU
Issue 02 (2014-05-27)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
87