IDS2000 Dual-Row Aisle Containment
Installation Guide (Split-type Skylight, Old-Version
Sliding Door)
1 Installation Preparations
Issue 02 (2015-06-30)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
1
1
Installation Preparations
1.1 Tools and Meters
You need to prepare the tools and meters required for installation.
Table 1-1
Tools and meters
Name, Specifications, and Appearance
Protective gloves
Marker
Measuring tape (5
m)
Level
Ladder (2 m)
Phillips screwdriver
(M4, M6, and M8)
Phillips screwdriver
(M4, less than 100
mm long)
Flat-head
screwdriver (2-5
mm)
Adjustable wrench
(6'')
Socket wrench (M6,
M8, and M12)
Hexkey
Box-end wrench
(M6, M8, and M12)
Electric screwdriver
Hand drill (Φ3,
Φ3.7, Φ4, Φ4.5, Φ5,
Φ6, Φ10, and Φ12
drill bit)
Hammer drill (Φ16
drill bit)
Heat gun