Figure 3-1
Power Control page
3
Click
Power Off
. In the displayed dialog box, click
OK
to power off the compute node.
----End
3.2 Powering On the Compute Node
Power on the compute node using the iBMC WebUI. Before powering on the compute node,
you need to obtain the IP address of the iBMC management network port, and the user name
and password for logging in to the iBMC WebUI. For details about how to obtain the IP
address of the management network port and how to operate the iBMC, see the
G5500 Server 1.0.0 iBMC User Guide
.
Before powering on the compute node, note the following:
l
Before the power-on, ensure that the power supply units (PSUs) are switched off, all
cables are connected correctly, and the power supply voltage meets the requirements.
l
During the power-on, do not remove or insert hard disks or cables, such as the network
cable and console port cable.
l
After the compute node is powered off, wait for at least 1 minute and then switch on the
PSUs again.
The methods for powering on the compute node are as follows, depending on the power status
of PSUs:
l
If PSUs are properly installed and not powered on, power on the compute node as
follows:
Connect the external power supply to PSUs. Then the compute node will power on with
PSUs.