FusionModule5000 Smart Modular Data Center
Installation Guide (Single-Row Aisle Containment with
2000 mm High Cabinets, ECC800)
9 Installing Monitoring Devices
Issue 01 (2019-03-05)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
150
Figure 9-54
Routing the access monitoring cable (a pad is configured)
(1) Access monitoring cable
(2) Pad power adapter cable
Figure 9-55
Routing the access monitoring cable (no pad is configured)
Step 5
Tighten two M3 captive screws to secure the baffle plate to the hanging kit, as shown in