Figure 7-1
Detecting smoke
(1) Smoke compartment
(2) ALM indicator
----End
7.1.2 How to Set and Add the WLDS900 Water Sensor
If a water sensor is installed, perform the following steps to configure it.
Prerequisites
One end of the straight-through cable has been connected to the RJ45 port on the WLDS900
water sensor, and the other end has been connected to the AI/DI port on the ECC800.
Context
To use the AI/DI sensor, enable the corresponding AI/DI port and name the sensor. The
specific alarm then can be reported.
If the sensor is prefabricated, only check its settings.
The actual value prevails. Only the method of the parameter settings is described.
Procedure
Step 1
Set water sensor parameters.