FusionModule2000 Smart Modular Data Center
Installation Guide
10 Installing the Aisle Containment
Issue 02 (2018-03-31)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
126
Press down the stop block springs when installing the stop block screws.
Figure 10-35
Installing the guide rail and glass doors
Step 3
Install dampers, as shown in
1.
Slide a damper into the glass door, as shown by (1) in
2.
Snap the damper into the post, and verify that the damper is in close contact with the post,
as shown by (2) and (3) in
3.
Secure the damper to the post using two M4x10 countersunk screws, as shown by (4) in
4.
Install the damper on the other side in the same way.