Description 

This document describes the precautions, processes, parameters, and drawings for installing 
the Data Center, providing installation guidance and technical support for onsite installation 
personnel and technical support engineers. 

Intended Audience 

This document is intended for: 

 

Maintenance engineers 

 

Technical support engineers 

 

System engineers 

 

Commissioning engineers 

 

Data configuration engineers 

Symbol Conventions 

The symbols that may be found in this document are defined as follows. 

Symbol 

Remarks 

 

Indicates an imminently hazardous situation which, if 
not avoided, will result in serious injury or death. 

 

Indicates a potentially hazardous situation which, if not 
avoided, could result in serious injury or death. 

 

Indicates a potentially hazardous situation which, if not 
avoided, may result in minor or moderate injury. 

 

Indicates a potentially hazardous situation which, if not 
avoided, could result in equipment damage, data loss, 
performance deterioration, or unanticipated results. 

NOTICE is used to address practices not related to 
personal injury. 

Содержание FusionModule1000A40 ICT Solution

Страница 1: ...FusionModule1000A40 Prefabricated All in One Data Center Quick Installation Guide 2019 UAE Apollo II Issue 01 Date 2019 04 29 HUAWEI TECHNOLOGIES CO LTD ...

Страница 2: ...stomer All or part of the products services and features described in this document may not be within the purchase scope or the usage scope Unless otherwise specified in the contract all statements information and recommendations in this document are provided AS IS without warranties guarantees or representations of any kind either express or implied The information in this document is subject to ...

Страница 3: ...support engineers System engineers Commissioning engineers Data configuration engineers Symbol Conventions The symbols that may be found in this document are defined as follows Symbol Remarks Indicates an imminently hazardous situation which if not avoided will result in serious injury or death Indicates a potentially hazardous situation which if not avoided could result in serious injury or death...

Страница 4: ... Symbol Remarks Calls attention to important information best practices and tips NOTE is used to address information not related to personal injury equipment damage and environment deterioration Change History Changes between document issues are cumulative The latest document issue contains all updates made in previous issues Issue 01 2019 04 29 This issue is the first official release ...

Страница 5: ... One Data Center Quick Installation Guide 2019 UAE Apollo II Contents Issue 01 2019 04 29 Copyright Huawei Technologies Co Ltd iv Contents Quick Installation Guide ii 1 Quick Installation Guide Usage 1 2 Installation Drawings and Parameters 3 ...

Страница 6: ...on for commissioning only after it has been installed and passed the installation check Precautions provided in this document are only supplementary to the local laws and regulations governing the Data Center Some parameters mentioned in this document should be provided and configured by onsite technical support engineers based on the actual application of the Data Center Put on necessary protecti...

Страница 7: ...nction O M FusionModule1000A40 Prefabricated All in One Data Center V200R003 Installation Guide Provides guidance on the onsite installation method FusionModule1000A40 Prefabricated All in One Data Center V200R003 Commissioning Guide Describes how to perform the power on commissioning FusionModule1000A40 Prefabricated All in One Data Center V200R003 Maintenance Guide Describes how to perform the O...

Страница 8: ...0 Prefabricated All in One Data Center Quick Installation Guide 2019 UAE Apollo II 2 Installation Drawings and Parameters Issue 01 2019 04 29 Copyright Huawei Technologies Co Ltd 3 2 Installation Drawings and Parameters ...

Страница 9: ... NO M004 Monitoring Device Installation Position Diagram Installing the WiFi Antenna Installing the WiFi antenna NO M004 Monitoring Device Installation Position Diagram Installing a Pad Installing a Pad NO M004 Monitoring Device Installation Position Diagram Optional Installing the Fire Cylinder CE Installing Batteries for the Extinguishant Control Panel CE Connecting External Cables Installing Ex...

Страница 10: ...Ground Concrete platform Single capacity base height 300 NO S002 Site Space and Pre fab Module Installation Position Diagram Single capacity Base Scenario ...

Страница 11: ...NO S003 Pre fab Module Grounding Position Diagram ...

Страница 12: ...NO S005 External Cable Tray Installation Position Diagram ...

Страница 13: ...NO S006 Fire Hammer Installation Position Diagram ...

Страница 14: ...NO S007 FIG rain eave mounting position ...

Страница 15: ...Pipe window NO S004 Pre fab Module Pipe Installation Position Diagram ...

Страница 16: ...r model 42 kW NetCol5000 A042 Air Conditioner Outdoor Unit Wiring Port Layout Diagram Technical requirements 1 The signal cable between indoor and outdoor units is an RS485 communications cable 2 Crimp cord end terminals at both ends of the cable 3 Connect the communications cable to ports 3 4 and 5 of the outdoor unit signal terminal 4 Black corresponds to 3 white corresponds to 4 and green corre...

Страница 17: ...1200 Signal window 100 DOOR DOOR EXIT BREAK GLASS DOOR PAD PAD DOOR Install the pad onsite NO M004 Monitoring Device Installation Position Diagram Install the WiFi Converter onsite ...

Страница 18: ...B1 42kW Install the external horn strobe onsite Install the extinguishant control panel batteries onsite Install the electrical actuator onsite Install the gas cylinder onsite NO F004 Fire Extinguishing Device Installation Position Diagram CE ...

Страница 19: ...e zero halogen CE 4x185 1x95 mm 2 Black 4 1Cores Yellow Gree n Red Blue Black L1 L2 L3 Provided by Customer DT185 M12 Recomme nded torque M12 500 653 Provided by Customer DT185 M12 Recomme nded torque M12 500 653 N Provided by Customer DT185 M12 Recomme nded torque M12 500 653 Provided by Customer DT185 M12 Recomme nded torque M12 500 653 PE Provided by Customer DT95 M12 Recommen ded torque M12 50...

Страница 20: ... y Battery 24022490 Battery VRLA battery 12V 100Ah 12V monomer 330mm width 174mm depth 222mm height 1 Shuangdeng 6 GFM 100 UPS dedicated battery UPS dedicated battery 40pcs Terminal 14170552 Bare crimp terminal JG 95mm 2 M6 250A tin Wiring terminals between batterie 90pcs Cable 25033516 Electronic power cable 600V 1000V WDZB YJY 95mm 2 black low smoke zero halogen CE Connecting Cables Between Batt...