FusionModule1000A40 Prefabricated All-in-One Data
Center
Installation Guide
4 Installing Pre-fab. Modules
Issue 03 (2020-06-09)
Copyright © Huawei Technologies Co., Ltd.
14
4
Installing Pre-fab. Modules
4.1 (Optional) Concrete Platform Scenario
4.1.1 Determining the Pre-fab. Module Installation Position
Prerequisites
The field meets site requirements.
Before installing pre-fab. modules, check the height of concrete platforms and ensure
that the height (altitude) error between the upper surfaces of all platforms does not
exceed 5 mm.
Concrete platform levelness is critical to pre-fab. module installation. Ensure that the concrete
platform meet requirements before installing pre-fab. modules.
Context
Before installing pre-fab. modules, determine their installation positions and directions based
on site space.
Preparations
Tools: marker, ink foundation, long leather measuring tape
Materials: none
Skill requirement: skilled technician
Procedure
Step 1
Determine the reference points for installing pre-fab. modules on the concrete platforms.
Mark the reference points using a marker.
Step 2
On the basis of the reference points, mark the mounting positions for the four corner fittings
of a pre-fab. module using an ink fountain and long leather measuring tape.