Huawei AR500&AR530&AR550 series IndustrialSwitch Routers
Hardware Installation andMaintenance Guide
Issue
05
Date
2015-12-01
HUAWEI TECHNOLOGIES CO., LTD.
Страница 1: ...Huawei AR500 AR530 AR550 series Industrial Switch Routers Hardware Installation and Maintenance Guide Issue 05 Date 2015 12 01 HUAWEI TECHNOLOGIES CO LTD ...
Страница 2: ...cument may not be within the purchase scope or the usage scope Unless otherwise specified in the contract all statements information and recommendations in this document are provided AS IS without warranties guarantees or representations of any kind either express or implied The information in this document is subject to change without notice Every effort has been made in the preparation of this d...
Страница 3: ...rdous situation which if not avoided will result in death or serious injury Indicates a potentially hazardous situation which if not avoided could result in death or serious injury Indicates a potentially hazardous situation which if not avoided may result in minor or moderate injury Indicates a potentially hazardous situation which if not avoided could result in equipment damage data loss perform...
Страница 4: ...oor LTE Remote Antenna l 3 6 3 Connecting an Outdoor LTE Antenna Updates in Issue 04 2015 08 15 This issue has the following updates The following sections are added l 4 3 Scenario 3 Mounting the Router in a Cabinet Using a 530 Horizontal Rack Mounting Kit l 4 4 Scenario 4 Installing the Router in a Cabinet Using a 550 Horizontal Rack Mounting Kit l 5 2 Scenario 2 Mounting the Router in a Cabinet ...
Страница 5: ... 6 Connecting 2 pin DC Power Cables Issue 01 2014 11 30 Initial official release Huawei AR500 AR530 AR550 series Industrial Switch Routers Hardware Installation and Maintenance Guide About This Document Issue 05 2015 12 01 Huawei Proprietary and Confidential Copyright Huawei Technologies Co Ltd iv ...
Страница 6: ...Outdoor LTE Antenna 25 3 7 Connecting the Router 27 3 7 1 Connecting the Console Cable 27 3 7 2 Connecting Ethernet Cables 28 3 7 3 Connecting the Ground Cable 29 3 7 4 Connecting RS485 RS422 Cables 30 3 7 5 Connecting the Power Cable 32 3 8 Powering On and Off the Router 35 4 Installing an AR530 Series Industrial Switching Router 37 4 1 Scenario 1 Mounting the Router on a DIN Rail 38 4 2 Scenario...
Страница 7: ...e Cable 101 5 6 3 Connecting Ethernet Cables 103 5 6 4 Connecting Optical Modules and Optical Fibers 105 5 6 5 Connecting Boolean Output Cables 107 5 6 6 Connecting 2 pin DC Power Cables 110 5 6 7 Connecting the 180 W PoE Midspan 115 5 7 Powering On and Off the Router 122 6 Appendix 125 6 1 Appendix A Indicators 126 6 2 Appendix B On site Cable Assembly and Installation 135 6 2 1 Cable Assembly Pr...
Страница 8: ...on to Labels 191 6 5 2 Engineering Labels for Optical Fibers 199 6 5 3 Engineering Labels for Network Cables 202 6 5 4 Engineering Labels for User Cables 203 6 5 5 Engineering Labels for Power Cables 204 6 6 Appendix F Guide to Using Optical Modules 207 6 7 Appendix G Fault Tag 210 Huawei AR500 AR530 AR550 series Industrial Switch Routers Hardware Installation and Maintenance Guide Contents Issue ...
Страница 9: ... appearance of the equipment Figure 1 1 shows appearances of the AR series routers Huawei AR500 AR530 AR550 series Industrial Switch Routers Hardware Installation and Maintenance Guide 1 Introduction to the Industrial Routers Issue 05 2015 12 01 Huawei Proprietary and Confidential Copyright Huawei Technologies Co Ltd 1 ...
Страница 10: ...r installing the AR530 series routers are the same This document uses the AR531 F2C H as an example to describe the installation methods For details see 4 Installing an AR530 Series Industrial Switching Router l The procedures and methods for installing the AR550 series routers are the same This document uses the AR550 8FE D H as an example to describe the installation methods For details see 5 In...
Страница 11: ...te 2 3 Checking the Cabinet 2 4 Checking the Power Supply System 2 5 Preparing Installation Tools Huawei AR500 AR530 AR550 series Industrial Switch Routers Hardware Installation and Maintenance Guide 2 Preparations for Installation Issue 05 2015 12 01 Huawei Proprietary and Confidential Copyright Huawei Technologies Co Ltd 3 ...
Страница 12: ... l Before performing any operation on the equipment wear ESD clothing and ESD gloves or an ESD wrist strap Remove conductive objects like jewelry and watch to avoid electric shock or burn l After installing the equipment in a cabinet rack connect a ground cable to the equipment before any operations on the equipment Remove the ground cable only after you remove all the other components and cables ...
Страница 13: ... from bruise or sprain l Before pulling the equipment out of the cabinet rack check whether there are any unstable or heavy objects on the cabinet rack Be careful not to make the objects fall which may cause body injuries l Do not drill holes on a cabinet without permission Unqualified holes on a cabinet affect the electromagnetic filter performance of the cabinet and cause damages to the cables i...
Страница 14: ...ment downstream or near a water source such as a sink or laundry room or in an area with a high humidity l Do not touch the equipment with wet hands Dust Proofing When the equipment is installed outdoors the installation site must have IP55 protection capability to ensure normal operation of the equipment NOTE IP indicates International Protection rating In IP55 the first 5 indicates the dust prot...
Страница 15: ...he clearance below the router must be greater than or equal to the router s height Grounding The cabinet must provide a reliable ground point to ground the router Heat dissipation l Sufficient space must be reserved around the cabinet l If a router is placed in a closed cabinet the cabinet must have air vents to ensure good ventilation 2 4 Checking the Power Supply System Table 2 2 lists power sup...
Страница 16: ... voltage range 12 V 24 V 48 V Maximum voltage range 9 6 V to 60 V l Operating voltage range for the AR550 series industrial switching routers DC input voltage Rated voltage range 12 V to 48 V Maximum voltage range 9 6 V to 60 V 2 5 Preparing Installation Tools Table 2 3 lists the installation tools required for router installation Table 2 3 Installation tools Tool Function Picture Measuring tape M...
Страница 17: ...Cuts insulation tubes and cable ties Multimeter Tests cabinet insulation cable connectivity and equipment electrical performance indicators including voltage current and resistance Crimping tool Crimps network cables Network cable tester Tests network cable connectivity and helps locate network faults Huawei AR500 AR530 AR550 series Industrial Switch Routers Hardware Installation and Maintenance G...
Страница 18: ...rench Loosens and fastens nuts Vacuum cleaner Absorbs dusts Level Checks whether a plane is horizontal Huawei AR500 AR530 AR550 series Industrial Switch Routers Hardware Installation and Maintenance Guide 2 Preparations for Installation Issue 05 2015 12 01 Huawei Proprietary and Confidential Copyright Huawei Technologies Co Ltd 10 ...
Страница 19: ...Scenario 4 Installing the Router in a Meter Box 3 5 Installing a SIM Card 3 6 Optional Installing Antennas 3 7 Connecting the Router 3 8 Powering On and Off the Router Huawei AR500 AR530 AR550 series Industrial Switch Routers Hardware Installation and Maintenance Guide 3 Installing an AR500 Series Industrial Access Router Issue 05 2015 12 01 Huawei Proprietary and Confidential Copyright Huawei Tec...
Страница 20: ...d Accessories l Rubber pads four Procedure Step 1 Attach four rubber pads in the imprinted round areas marked plus signs at the bottom of the router Step 2 Gently place the router on the desk Huawei AR500 AR530 AR550 series Industrial Switch Routers Hardware Installation and Maintenance Guide 3 Installing an AR500 Series Industrial Access Router Issue 05 2015 12 01 Huawei Proprietary and Confident...
Страница 21: ...e are no flammable or explosive materials near the router and no obstructions within 100 mm around the router l Install the router at an appropriate height to ensure that the indicators can be observed easily Tools and Accessories l Measuring tape l Marker l Phillips screwdriver l Mounting bracket l M3x6 countersunk screws four l M4x8 pan head screws two Huawei AR500 AR530 AR550 series Industrial ...
Страница 22: ...er to fix the mounting bracket on the rear of the router with four countersunk M3x6 screws Step 3 Mount the router on the wall 1 Use the Phillips screwdriver to install two M4x8 pan head screws in the marked positions on the wall and leave 2 mm of the screws out of the wall Huawei AR500 AR530 AR550 series Industrial Switch Routers Hardware Installation and Maintenance Guide 3 Installing an AR500 S...
Страница 23: ...nect power cables while the power is on Make sure the following prerequisites are met before the installation l The DIN rail has been secured in position l The router is placed near the DIN rail for convenient movement Huawei AR500 AR530 AR550 series Industrial Switch Routers Hardware Installation and Maintenance Guide 3 Installing an AR500 Series Industrial Access Router Issue 05 2015 12 01 Huawe...
Страница 24: ...f the router in front of the DIN rail and ensure that the DIN rail fits in between the fixture near the top of the DIN mounting kit and the spring latch near the bottom Step 4 Make the router incline forward with the bottom away from the DIN rail and place the fixture at the rear of the DIN mounting kit on the top of the DIN rail Huawei AR500 AR530 AR550 series Industrial Switch Routers Hardware I...
Страница 25: ...d 3 4 Scenario 4 Installing the Router in a Meter Box Context DANGER To avoid electric shock do not connect power cables while the power is on Make sure the following prerequisites are met before the installation l The DIN rail has been secured in position Huawei AR500 AR530 AR550 series Industrial Switch Routers Hardware Installation and Maintenance Guide 3 Installing an AR500 Series Industrial A...
Страница 26: ... panel of the router with M3 screws and then use a Phillips screwdriver to tighten the M3 screws Step 3 Use the Phillips screwdriver to loosen the screws on the left fixture on the DIN rail in the meter box and then move the fixture to leave appropriate clearance for the router Huawei AR500 AR530 AR550 series Industrial Switch Routers Hardware Installation and Maintenance Guide 3 Installing an AR5...
Страница 27: ...spring latch near the bottom of the DIN mounting kit move down The spring latch then bounces back to fix the router on the DIN rail NOTE If the spring latch is too tight to move down you can pull down the spring latch during the installation Step 7 Move the left fixture to attach it to the router and then use the Phillips screwdriver to tighten the screws on the fixture Huawei AR500 AR530 AR550 se...
Страница 28: ... loosen the screw on the SIM card cover and remove the SIM card cover from the router Keep the SIM card cover in an appropriate place for later use Step 2 Push the SIM card holder toward the OPEN direction and turn it upward Place the SIM card into the SIM card slot close the SIM card holder and push the SIM card holder toward the LOCK direction When you hear a click the SIM card holder is locked ...
Страница 29: ...l it in slot SIM1 Step 3 Install the SIM card cover back to the router and tighten the screw to fix the cover 56 4 25 1 a b c End 3 6 Optional Installing Antennas Huawei AR500 AR530 AR550 series Industrial Switch Routers Hardware Installation and Maintenance Guide 3 Installing an AR500 Series Industrial Access Router Issue 05 2015 12 01 Huawei Proprietary and Confidential Copyright Huawei Technolo...
Страница 30: ...nas Procedure Step 1 Connect the LTE whip antennas to the SMA connectors on the router WIFI WIFI WIFI Step 2 Adjust positions of the antennas to obtain the optimal wireless transmission and receiving performance l If the router is placed on a desk make the primary antenna vertical to the desk and the secondary antenna parallel to the desk Huawei AR500 AR530 AR550 series Industrial Switch Routers H...
Страница 31: ... secondary antenna vertical to the wall Huawei AR500 AR530 AR550 series Industrial Switch Routers Hardware Installation and Maintenance Guide 3 Installing an AR500 Series Industrial Access Router Issue 05 2015 12 01 Huawei Proprietary and Confidential Copyright Huawei Technologies Co Ltd 23 ...
Страница 32: ...erfaces when connecting cables Incorrect cable connections may damage interface modules or the router Huawei AR500 AR530 AR550 series Industrial Switch Routers Hardware Installation and Maintenance Guide 3 Installing an AR500 Series Industrial Access Router Issue 05 2015 12 01 Huawei Proprietary and Confidential Copyright Huawei Technologies Co Ltd 24 ...
Страница 33: ...onnecting an Outdoor LTE Antenna Context If a router deployed indoors cannot receive strong LTE signals connect an outdoor LTE antenna to the router To protect the router from lightning strikes use a surge protector between the antenna and router NOTICE l Do not power on the router before you finish connecting cables l Notice flags on interfaces when connecting cables Incorrect cable connections m...
Страница 34: ... slack Tools and Accessories l LTE outdoor antenna l Phillips screwdriver or flat head screwdriver l Multimeter l Combination wrench l Pole l Extension cables l Surge protector Procedure Step 1 Determine the position where the antenna will be installed on the pole Step 2 Fix the outdoor LTE antenna on the fixture delivered with the antenna and then mount the antenna and fixture on the pole as show...
Страница 35: ... is smaller than or equal to 10 ohm Step 8 Connect the N F end of the N F SMA J extension cable to the Protect terminal of the surge protector and the SMA J end to the LTE interface of the router End 3 7 Connecting the Router 3 7 1 Connecting the Console Cable Context NOTICE l Do not power on the router before you finish connecting cables l Notice flags on interfaces when connecting cables Incorre...
Страница 36: ... the interface module or the router Tools and Accessories l Diagonal pliers l Marker l Cable ties separately purchased l Ethernet cables separately purchased l Labels for Ethernet cables self prepared Procedure Step 1 Select Ethernet cables of appropriate quantity and lengths according to the number of interfaces and measured cabling distances Huawei AR500 AR530 AR550 series Industrial Switch Rout...
Страница 37: ...ormal labels 2 cm away from the connectors at both ends End Follow up Procedure Check the following items after connecting Ethernet cables l Labels are correctly filled and securely attached to cables with texts facing the same direction l Cables and connectors are complete intact and tightly connected All cable connections are correct 3 7 3 Connecting the Ground Cable Context NOTICE l The ground ...
Страница 38: ...e M4 screw 3 Connect the M6 lug of the ground cable to a ground point on the wall or DIN rail and secure the M6 lug with an M6 screw 12 24V 1A 12 24V 1A Ground cable a b c End Follow up Procedure Perform the following operations after connecting the ground cable l Check that the ground cable is securely connected to the ground points l Use a multimeter to measure the resistance between the ground ...
Страница 39: ...bles are connected to the 5 pin terminal block in the same way The following procedure uses one cable as an example 1 Use a wire stripper to peel about 7 mm length of insulation coating off one end of the cable NOTICE Do not cut the metal conductor of the cable when peeling insulation coating 2 Insert the bare wire into a wire hole 3 Tighten the screw on the wire hole with a flat head screwdriver ...
Страница 40: ...s at both ends of the terminal block with a flat head screwdriver 2 Connect the RS485 RS422 cables at the other end to a meter or monitoring device l Meter or monitoring device End 3 7 5 Connecting the Power Cable Huawei AR500 AR530 AR550 series Industrial Switch Routers Hardware Installation and Maintenance Guide 3 Installing an AR500 Series Industrial Access Router Issue 05 2015 12 01 Huawei Pro...
Страница 41: ...in a close contact with your wrist Step 3 Connect power cables NOTE The router does not have a power switch and its power supply is controlled by the power switch of the external power supply system l Connect the router to an external power supply system a Connect the 4 pin DC connector of the router s power cable to the packet socket on the router and the other end to an external DC power supply ...
Страница 42: ...f the self contained power cable of the 25 W open frame power supply to the power adapter plate c Connect the input terminal of the AC power cable for the 25 W open frame power supply to the power socket on 25 W open frame power supply and connect the power plug at the other end to an AC power source Huawei AR500 AR530 AR550 series Industrial Switch Routers Hardware Installation and Maintenance Gu...
Страница 43: ...n and Off the Router Context Check the following items before powering on the router l The power cables are correctly connected l The DC input voltage is in the range of 8 V to 36 V Procedure l Power on the router Turn on the power switch of the external power supply system to start the router Huawei AR500 AR530 AR550 series Industrial Switch Routers Hardware Installation and Maintenance Guide 3 I...
Страница 44: ...er NOTICE Powering off the router will interrupt all the services on the router Exercise caution when deciding to perform this operation Turn off the power switch of the external power supply system End Follow up Procedure After the router starts you can log in to its CLI to configure manage and maintain the router For details see the CLI based Configuration Huawei AR500 AR530 AR550 series Industr...
Страница 45: ...in a Cabinet Using a 550 Horizontal Rack Mounting Kit 4 5 Scenario 5 Mounting the Router in a Cabinet Using a Mounting Kit 4 6 Installing SIM Cards 4 7 Optional Installing Antennas 4 8 Connecting the Router 4 9 Powering On and Off the Router Huawei AR500 AR530 AR550 series Industrial Switch Routers Hardware Installation and Maintenance Guide 4 Installing an AR530 Series Industrial Switching Router...
Страница 46: ...ts two l Lock nuts two l Stainless steel sheet one l M4x20 screws three l M4x30 screws two l Combination wrench 10 mm l Phillips screwdriver Procedure Step 1 Screw lock nuts on the hex bolts and fix the hex bolts on the mounting bracket Huawei AR500 AR530 AR550 series Industrial Switch Routers Hardware Installation and Maintenance Guide 4 Installing an AR530 Series Industrial Switching Router Issu...
Страница 47: ...rail is fixed with the raised hex bolts tighten the lock nuts by rotating the wrench counterclockwise Huawei AR500 AR530 AR550 series Industrial Switch Routers Hardware Installation and Maintenance Guide 4 Installing an AR530 Series Industrial Switching Router Issue 05 2015 12 01 Huawei Proprietary and Confidential Copyright Huawei Technologies Co Ltd 39 ...
Страница 48: ...ps screwdriver Step 5 Use two M4x20 screws to fix the stainless steel sheet on the router Huawei AR500 AR530 AR550 series Industrial Switch Routers Hardware Installation and Maintenance Guide 4 Installing an AR530 Series Industrial Switching Router Issue 05 2015 12 01 Huawei Proprietary and Confidential Copyright Huawei Technologies Co Ltd 40 ...
Страница 49: ... and keep it in an appropriate place for later use Huawei AR500 AR530 AR550 series Industrial Switch Routers Hardware Installation and Maintenance Guide 4 Installing an AR530 Series Industrial Switching Router Issue 05 2015 12 01 Huawei Proprietary and Confidential Copyright Huawei Technologies Co Ltd 41 ...
Страница 50: ...n the mounting holes on the router with those on the mounting bracket Use two M4x30 screws to fix the router onto the mounting bracket and tighten the topmost screw on the mounting bracket Huawei AR500 AR530 AR550 series Industrial Switch Routers Hardware Installation and Maintenance Guide 4 Installing an AR530 Series Industrial Switching Router Issue 05 2015 12 01 Huawei Proprietary and Confident...
Страница 51: ...fall down after cables are connected l Ensure that there are no flammable or explosive materials near the router and no obstructions within 100 mm around the router l Install the router at an appropriate height to ensure that the indicators can be observed easily Huawei AR500 AR530 AR550 series Industrial Switch Routers Hardware Installation and Maintenance Guide 4 Installing an AR530 Series Indus...
Страница 52: ...tach the mounting bracket against the wall and adjust its position to keep the top and bottom edges horizontal Mark positions of the four mounting holes with a marker 120mm 130mm Huawei AR500 AR530 AR550 series Industrial Switch Routers Hardware Installation and Maintenance Guide 4 Installing an AR530 Series Industrial Switching Router Issue 05 2015 12 01 Huawei Proprietary and Confidential Copyri...
Страница 53: ...20 screw with the topmost tapped hole on the mounting bracket and screw it about 5 mm into the tapped hole with a Phillips screwdriver Step 4 Use two M4x20 screws to fix the stainless steel sheet on the router Huawei AR500 AR530 AR550 series Industrial Switch Routers Hardware Installation and Maintenance Guide 4 Installing an AR530 Series Industrial Switching Router Issue 05 2015 12 01 Huawei Prop...
Страница 54: ... and keep it in an appropriate place for later use Huawei AR500 AR530 AR550 series Industrial Switch Routers Hardware Installation and Maintenance Guide 4 Installing an AR530 Series Industrial Switching Router Issue 05 2015 12 01 Huawei Proprietary and Confidential Copyright Huawei Technologies Co Ltd 46 ...
Страница 55: ...n the mounting holes on the router with those on the mounting bracket Use two M4x30 screws to fix the router onto the mounting bracket and tighten the topmost screw on the mounting bracket Huawei AR500 AR530 AR550 series Industrial Switch Routers Hardware Installation and Maintenance Guide 4 Installing an AR530 Series Industrial Switching Router Issue 05 2015 12 01 Huawei Proprietary and Confident...
Страница 56: ...lation The clearance above the router must be at least two times the router s height and the clearance below the router must be greater than or equal to the router s height Make sure the following prerequisites are met before the installation Huawei AR500 AR530 AR550 series Industrial Switch Routers Hardware Installation and Maintenance Guide 4 Installing an AR530 Series Industrial Switching Route...
Страница 57: ...tal rack mounting kit NOTE The 530 horizontal rack mounting kit floating nuts M4 screws and M6 screws are not included in the installation accessory package and needs to be purchased separately Procedure Step 1 Use two M4x20 screws to fix the stainless steel sheet on the router Huawei AR500 AR530 AR550 series Industrial Switch Routers Hardware Installation and Maintenance Guide 4 Installing an AR5...
Страница 58: ...and keep it in an appropriate place for later use Huawei AR500 AR530 AR550 series Industrial Switch Routers Hardware Installation and Maintenance Guide 4 Installing an AR530 Series Industrial Switching Router Issue 05 2015 12 01 Huawei Proprietary and Confidential Copyright Huawei Technologies Co Ltd 50 ...
Страница 59: ...uter onto the rack mounting kit and tighten the topmost screw on the rack mounting kit AR530 Series INFRARED PWR RUN ALM RS485 0 RS485 1 AR531 F2C H 1 2 Step 4 Install two floating nuts on each front mounting rail of the cabinet Leave four mounting holes between the two floating nuts on the same mounting rail Huawei AR500 AR530 AR550 series Industrial Switch Routers Hardware Installation and Maint...
Страница 60: ...he router into the cabinet with one hand supporting bottom of the router and hook the brackets at both sides of the mounting kit on the M6 screws 3 Use the Phillips screwdriver to tighten the lower M6 screws and then the upper M6 screws 2mm a b c End 4 4 Scenario 4 Installing the Router in a Cabinet Using a 550 Horizontal Rack Mounting Kit Huawei AR500 AR530 AR550 series Industrial Switch Routers ...
Страница 61: ...ion wrench 10 mm l Phillips screwdriver l Flat head screwdriver l Floating nuts l 550 horizontal rack mounting kit NOTE The 550 horizontal rack mounting kit floating nuts M4 screws and M6 screws are not included in the installation accessory package and needs to be purchased separately Procedure Step 1 Install two floating nuts on each front mounting rail of the cabinet Leave four mounting holes b...
Страница 62: ...er M6 screws and then the upper ones to fix the rack mounting kit Step 3 Screw lock nuts on the hex bolts and fix the hex bolts on the mounting bracket Huawei AR500 AR530 AR550 series Industrial Switch Routers Hardware Installation and Maintenance Guide 4 Installing an AR530 Series Industrial Switching Router Issue 05 2015 12 01 Huawei Proprietary and Confidential Copyright Huawei Technologies Co ...
Страница 63: ...il is fixed with the raised hex bolts tighten the lock nuts by rotating the wrench counterclockwise Huawei AR500 AR530 AR550 series Industrial Switch Routers Hardware Installation and Maintenance Guide 4 Installing an AR530 Series Industrial Switching Router Issue 05 2015 12 01 Huawei Proprietary and Confidential Copyright Huawei Technologies Co Ltd 55 ...
Страница 64: ...ips screwdriver Step 7 Use two M4x20 screws to fix the stainless steel sheet on the router Huawei AR500 AR530 AR550 series Industrial Switch Routers Hardware Installation and Maintenance Guide 4 Installing an AR530 Series Industrial Switching Router Issue 05 2015 12 01 Huawei Proprietary and Confidential Copyright Huawei Technologies Co Ltd 56 ...
Страница 65: ... and keep it in an appropriate place for later use Huawei AR500 AR530 AR550 series Industrial Switch Routers Hardware Installation and Maintenance Guide 4 Installing an AR530 Series Industrial Switching Router Issue 05 2015 12 01 Huawei Proprietary and Confidential Copyright Huawei Technologies Co Ltd 57 ...
Страница 66: ... Use two M4x30 screws to fix the router onto the mounting bracket and tighten the topmost screw on the mounting bracket AR530 Series INFRAR ED PWR RUN AL M RS485 0 RS485 1 AR531 F2 C H End 4 5 Scenario 5 Mounting the Router in a Cabinet Using a Mounting Kit Huawei AR500 AR530 AR550 series Industrial Switch Routers Hardware Installation and Maintenance Guide 4 Installing an AR530 Series Industrial ...
Страница 67: ...cated near the cabinet for convenient movement Tools and Accessories l Phillips screwdriver l Mounting kit one l Stainless steel sheet one l M4x30 screws two l M4 screw six separately purchased Procedure Step 1 Loosen the screws on the front top cover with a Phillips screwdriver remove the front top cover and keep it in an appropriate place for later use L1 L2 L3 FE5 FE4 FE3 FE2 N A RS485 0 B A RS...
Страница 68: ...holes on the mounting kit and secure the router on the mounting kit with two M4x30 screws Huawei AR500 AR530 AR550 series Industrial Switch Routers Hardware Installation and Maintenance Guide 4 Installing an AR530 Series Industrial Switching Router Issue 05 2015 12 01 Huawei Proprietary and Confidential Copyright Huawei Technologies Co Ltd 60 ...
Страница 69: ...ure the mounting kit in the cabinet Huawei AR500 AR530 AR550 series Industrial Switch Routers Hardware Installation and Maintenance Guide 4 Installing an AR530 Series Industrial Switching Router Issue 05 2015 12 01 Huawei Proprietary and Confidential Copyright Huawei Technologies Co Ltd 61 ...
Страница 70: ...fix such problems l A SIM card is not hot swappable Table 4 1 lists the router models that support SIM cards Table 4 1 Router models supporting SIM cards Model SIM Card AR531G U D H Supported AR531GR U H Supported AR531GPe U H Supported Huawei AR500 AR530 AR550 series Industrial Switch Routers Hardware Installation and Maintenance Guide 4 Installing an AR530 Series Industrial Switching Router Issu...
Страница 71: ... the slot until you hear a click NOTICE When inserting a SIM card keep the notch on the SIM card in the same direction as the notch marked below the slot NOTE If only one SIM card needs to be installed install it in slot SIM1 on the left Step 3 Install the SIM card cover back to the router and tighten the screw to fix the cover 1 2 3 End 4 7 Optional Installing Antennas Huawei AR500 AR530 AR550 se...
Страница 72: ...nas are not included in the installation accessory package and need to be purchased separately Tools and Accessories l 3G whip antenna l ZigBee whip antenna Procedure Step 1 Connect the antennas to the SMA connectors on the rear panel of the router Step 2 Place the antennas in appropriate angles to facilitate installation of the cable outlet panel Huawei AR500 AR530 AR550 series Industrial Switch ...
Страница 73: ... need to be purchased separately Tools and Accessories l Sub GHz antenna l Self tapping screw l Anti theft screw Procedure Step 1 Insert the connector of the sub GHz antenna into the ZigBee sub GHz interface on the rear panel of the router Huawei AR500 AR530 AR550 series Industrial Switch Routers Hardware Installation and Maintenance Guide 4 Installing an AR530 Series Industrial Switching Router I...
Страница 74: ...e router against lightning and interference l Do not power on the router before you finish connecting cables Tools and Accessories l Phillips screwdriver l ESD wrist strap l Multimeter l Ground Cable l M6 screw separately purchased Huawei AR500 AR530 AR550 series Industrial Switch Routers Hardware Installation and Maintenance Guide 4 Installing an AR530 Series Industrial Switching Router Issue 05 ...
Страница 75: ...VE FE0 RST L1 L2 L3 N A RS485 0 B A RS485 1 DI 0 DI 1 B GE0 RX TX GE1 MONITOR RX TX FE2 FE4 FE1 FE3 FE5 Ground cable a b c FE6 Power outage Survival FE7 End Follow up Procedure Perform the following operations after connecting the ground cable l Check that the ground cable is securely connected to the ground points l Use a multimeter to measure the resistance between the ground points at two ends ...
Страница 76: ... to the console interface RJ45 of the router 2 Connect the DB9 connector of the console cable to the serial interface COM of a management PC Console cable COM interface CONSOLE RESERVE FE0 RST L1 L2 L3 N A RS485 0 B A RS485 1 DI 0 DI 1 B GE0 RX TX GE1 MONITOR RX TX FE2 FE4 FE1 FE3 FE5 FE6 Power outage Survival FE7 CONSOLE End Huawei AR500 AR530 AR550 series Industrial Switch Routers Hardware Insta...
Страница 77: ... to run the software 2 Select Session and set Connection type to Serial 3 Set serial port parameters 4 Click Open The router copyright statement is displayed Enter the user name and password as prompted to log in to the CLI of the router NOTE The default user name is admin and the default password is Admin huawei For details on how to log in through the console port see Logging In to the System fo...
Страница 78: ...tity and lengths according to the number of interfaces and measured cabling distances Step 2 Attach temporary labels to both ends of each Ethernet cable and write numbers on the labels to identify the Ethernet cables For details see 6 5 3 Engineering Labels for Network Cables Step 3 Connect one end of an Ethernet cable to an Ethernet interface of the router and the other end to an Ethernet interfa...
Страница 79: ...m the Ethernet cables and then attach formal labels 2 cm away from the connectors at both ends End Follow up Procedure Check the following items after connecting Ethernet cables l Labels are correctly filled and securely attached to cables with texts facing the same direction l Cables and connectors are complete intact and tightly connected Huawei AR500 AR530 AR550 series Industrial Switch Routers...
Страница 80: ...g procedure uses one cable as an example l Insert the eight cables into the 8 pin terminal block from left to right in the following sequence RS485 0 A B RS485 1 A B DI0 two and DI1 two 1 Use a wire stripper to peel about 7 mm length of insulation coating off one end of the cable NOTICE Do not cut the metal conductor of the cable when peeling insulation coating 2 Hold down the white button above a...
Страница 81: ...rfaces of the router and then tighten the slotted screws at both ends of the connector with a flat head screwdriver 2 Connect the RS485 cables to electric meters or other devices with RS485 interfaces and connect the DI cables to digital input devices Huawei AR500 AR530 AR550 series Industrial Switch Routers Hardware Installation and Maintenance Guide 4 Installing an AR530 Series Industrial Switch...
Страница 82: ...ptical Modules and Optical Fibers Context CAUTION Invisible laser beams will cause eye damage Do not look into bores of optical modules or connectors of optical fibers without eye protection Huawei AR500 AR530 AR550 series Industrial Switch Routers Hardware Installation and Maintenance Guide 4 Installing an AR530 Series Industrial Switching Router Issue 05 2015 12 01 Huawei Proprietary and Confide...
Страница 83: ... 2 Remove the dust plug from the optical module NOTE Place the dust plug in an appropriate place After optical fibers are removed from the optical module cover the optical module with the dust plug to protect it from dust Step 3 Before connecting optical fibers attach temporary labels on both ends of each optical fiber to identify them For details on how to make labels of optical fibers see 6 5 2 ...
Страница 84: ...ecting Power Cables Connecting 4 pin AC Power Cables Context DANGER To avoid electric shock do not connect power cables while the power is on NOTICE Do not power on a router before you finish installing the router and connecting cables The power cable length must be shorter than or equal to 3 m Table 4 4 lists the required specifications of the power cables Huawei AR500 AR530 AR550 series Industri...
Страница 85: ...l block in the same way The following procedure uses one cable as an example l Insert the four cables into the 4 pin terminal block from left to right in the sequence of L1 L2 L3 and N 1 Use a wire stripper to peel about 15 mm length of insulation coating off one end of the cable NOTICE Do not cut the metal conductor of the cable when peeling insulation coating 2 Insert a flat head screwdriver int...
Страница 86: ...nnect the 4 pin terminal block to the AC power socket of the router and push the slide blocks at two sides of the connector until you hear a click 2 Connect cables at the other end to an external AC power supply system Huawei AR500 AR530 AR550 series Industrial Switch Routers Hardware Installation and Maintenance Guide 4 Installing an AR530 Series Industrial Switching Router Issue 05 2015 12 01 Hu...
Страница 87: ... is on NOTICE Do not power on a router before you finish installing the router and connecting cables The power cable length must be shorter than or equal to 3 m Table 4 5 lists the required specifications of the power cables Huawei AR500 AR530 AR550 series Industrial Switch Routers Hardware Installation and Maintenance Guide 4 Installing an AR530 Series Industrial Switching Router Issue 05 2015 12...
Страница 88: ...e the 2 pin DC power cables NOTE l Two cables are connected to the 2 pin terminal block in the same way The following procedure uses one cable as an example l Insert the two cables into the 2 pin terminal block with the NEG cable in the left hole and the RTN cable in the right hole 1 Use a wire stripper to peel about 7 mm length of insulation coating off one end of the cable NOTICE Do not cut the ...
Страница 89: ... of wire holes and bare wires on the 2 pin terminal block Step 4 Connect the 2 pin DC power cables Huawei AR500 AR530 AR550 series Industrial Switch Routers Hardware Installation and Maintenance Guide 4 Installing an AR530 Series Industrial Switching Router Issue 05 2015 12 01 Huawei Proprietary and Confidential Copyright Huawei Technologies Co Ltd 81 ...
Страница 90: ... V 3 A or 48 V 4 A NEG RTN 12 V 6 A or 24 V 3 A or 48 V 4 A NEG RTN End 4 8 7 Connecting the 180 W PoE Midspan Context DANGER To avoid electric shock do not connect power cables while the power is on NOTICE Do not power on a router before you finish installing the router and connecting cables Tools and Accessories l Wire stripper l Flat head screwdriver Huawei AR500 AR530 AR550 series Industrial S...
Страница 91: ...ght in the sequence of live wire RTN neutral wire NEG and earth wire 1 Use a wire stripper to peel about 7 mm length of insulation coating off one end of the cable NOTICE Do not cut the metal conductor of the cable when peeling insulation coating 2 Insert the bare wire into a hole on the terminal block Then the reed is closed to lock the cable in the hole NOTICE There must be no exposed metal part...
Страница 92: ... Y VVR_ Y_YZKS Step 5 Connect a PD to the router 1 Connect a network interface of the router to an input GE interface of the 180 W PoE midspan using a network cable 2 Connect an output GE interface of the 180 W PoE midspan to the PD using another network cable Huawei AR500 AR530 AR550 series Industrial Switch Routers Hardware Installation and Maintenance Guide 4 Installing an AR530 Series Industri...
Страница 93: ...ssories l Diagonal pliers l Phillips screwdriver l Cable outlet panel l Plastic caps Procedure Step 1 Determine the cable outlets to be used on the cable outlet panel based on the number and positions of cables and use diagonal pliers to remove the covers from the cable outlets Huawei AR500 AR530 AR550 series Industrial Switch Routers Hardware Installation and Maintenance Guide 4 Installing an AR5...
Страница 94: ...h the uncovered outlets NOTE 4 pin AC power cables and 2 pin DC power cables are routed through the same outlet Step 3 Check all the external cables to ensure that they are routed out from the planned outlets Install the front top cover back to the router tighten screws on the cover and cover the screws with plastic caps Huawei AR500 AR530 AR550 series Industrial Switch Routers Hardware Installati...
Страница 95: ... Procedure l Power on the router Turn on the power switch of the external power supply system to start the router After the router starts check indicators on the front panel to check whether the router runs normally Figure 4 3 describes the indicator states when the router is running normally Huawei AR500 AR530 AR550 series Industrial Switch Routers Hardware Installation and Maintenance Guide 4 In...
Страница 96: ...reen The system power supply is normal RUN ALM Slow blinking green The system is running properly l Power off the router Huawei AR500 AR530 AR550 series Industrial Switch Routers Hardware Installation and Maintenance Guide 4 Installing an AR530 Series Industrial Switching Router Issue 05 2015 12 01 Huawei Proprietary and Confidential Copyright Huawei Technologies Co Ltd 88 ...
Страница 97: ...w up Procedure After the router starts you can log in to its CLI to configure manage and maintain the router For details see the CLI based Configuration Huawei AR500 AR530 AR550 series Industrial Switch Routers Hardware Installation and Maintenance Guide 4 Installing an AR530 Series Industrial Switching Router Issue 05 2015 12 01 Huawei Proprietary and Confidential Copyright Huawei Technologies Co...
Страница 98: ...5 4 Installing a 180 W PoE Midspan on a DIN Rail 5 5 Installing a 180 W PoE Midspan in a Cabinet 5 6 Connecting the Router 5 7 Powering On and Off the Router Huawei AR500 AR530 AR550 series Industrial Switch Routers Hardware Installation and Maintenance Guide 5 Installing an AR550 Series Industrial Switching Router Issue 05 2015 12 01 Huawei Proprietary and Confidential Copyright Huawei Technologi...
Страница 99: ...p of the router and spring latch near the bottom Step 2 Make the router incline forward with the bottom away from the DIN rail and place the fixture on the top of the DIN rail Step 3 Slowly push the router toward the DIN rail to make the spring latch at the rear of the router move down The spring latch then bounces back to fix the router on the DIN rail Huawei AR500 AR530 AR550 series Industrial S...
Страница 100: ...ment Tools and Accessories l Phillips screwdriver l Flat head screwdriver l Floating nuts l M4 screws l M6 screws l 550 horizontal rack mounting kit NOTE The 550 horizontal rack mounting kit floating nuts M4 screws and M6 screws are not included in the installation accessory package and needs to be purchased separately Procedure Step 1 Install two floating nuts on each front mounting rail of the c...
Страница 101: ... the router and the spring latch near the bottom Step 4 Make the router incline forward with the bottom away from the DIN rail and place the fixture at the rear of the router on the top of the DIN rail Step 5 Slowly push the router toward the DIN rail to make the spring latch at the rear of the router move down The spring latch then bounces back to fix the router on the DIN rail Huawei AR500 AR530...
Страница 102: ...in position l The 60 W AC power module is placed near the DIN rail for convenient movement Tools and Accessories l ESD wrist strap l Phillips screwdriver l M3 screws l DIN rail l 60 W AC power module NOTE The 60 W AC power module is not included in the installation accessory package and needs to be purchased separately Huawei AR500 AR530 AR550 series Industrial Switch Routers Hardware Installation...
Страница 103: ...d spring latch near the bottom Step 4 Make the power module incline forward with the bottom away from the DIN rail and place the fixture at the rear of the DIN mounting kit on the top of the DIN rail Step 5 Slowly push the power module toward the DIN rail to make the spring latch near the bottom of the DIN mounting kit move down The spring latch then bounces back to fix the power module on the DIN...
Страница 104: ...llowing prerequisites are met before the installation l The DIN rail has been secured in position l The router is placed near the DIN rail for convenient movement Tools and Accessories l DIN rail l 180 W PoE midspan Huawei AR500 AR530 AR550 series Industrial Switch Routers Hardware Installation and Maintenance Guide 5 Installing an AR550 Series Industrial Switching Router Issue 05 2015 12 01 Huawe...
Страница 105: ... fixture at the rear of the PoE midspan on the top of the DIN rail Step 3 Slowly push the PoE midspan toward the DIN rail to make the spring latch at the rear of the PoE midspan move down The spring latch then bounces back to fix the PoE midspan on the DIN rail NOTE If the spring latch is too tight to move down you can pull down the spring latch during the installation End Huawei AR500 AR530 AR550...
Страница 106: ...wdriver l Floating nuts l M4 screws l M6 screws l 550 horizontal rack mounting kit NOTE The 180 W PoE midspan 550 horizontal rack mounting kit floating nuts M4 screws and M6 screws are not included in the installation accessory package and needs to be purchased separately Procedure Step 1 Install two floating nuts on each front mounting rail of the cabinet Leave four mounting holes between the two...
Страница 107: ...idspan and the spring latch near the bottom Step 4 Make the PoE midspan incline forward with the bottom away from the DIN rail and place the fixture at the rear of the PoE midspan on the top of the DIN rail Step 5 Slowly push the PoE midspan toward the DIN rail to make the spring latch at the rear of the PoE midspan move down The spring latch then bounces back to fix the PoE midspan on the DIN rai...
Страница 108: ... l Do not power on the router before you finish connecting cables Tools and Accessories l Phillips screwdriver l ESD wrist strap l Ground Cable l M6 screw separately purchased Procedure Step 1 Wear an ESD wrist strap Ensure that the ESD wrist strap is grounded and in a close contact with your wrist Step 2 Connect the ground cable Huawei AR500 AR530 AR550 series Industrial Switch Routers Hardware I...
Страница 109: ...e ground cable with the M4 screw 3 Connect the M6 lug of the ground cable to a ground point on the wall or DIN rail and secure the M6 lug with an M6 screw a b c XU TJ IGHRK End 5 6 2 Connecting the Console Cable Huawei AR500 AR530 AR550 series Industrial Switch Routers Hardware Installation and Maintenance Guide 5 Installing an AR550 Series Industrial Switching Router Issue 05 2015 12 01 Huawei Pr...
Страница 110: ... 1 Connect the console cable 1 Connect the RJ45 connector of the console cable to the console interface RJ45 of the router 2 Connect the DB9 connector of the console cable to the serial interface COM of a management PC 53 OTZKXLGIK UTYURK IGHRK End Huawei AR500 AR530 AR550 series Industrial Switch Routers Hardware Installation and Maintenance Guide 5 Installing an AR550 Series Industrial Switching...
Страница 111: ...to run the software 2 Select Session and set Connection type to Serial 3 Set serial port parameters 4 Click Open The router copyright statement is displayed Enter the user name and password as prompted to log in to the CLI of the router NOTE The default user name is admin and the default password is Admin huawei For details on how to log in through the console port see Logging In to the System for...
Страница 112: ...tity and lengths according to the number of interfaces and measured cabling distances Step 2 Attach temporary labels to both ends of each Ethernet cable and write numbers on the labels to identify the Ethernet cables For details see 6 5 3 Engineering Labels for Network Cables Step 3 Connect one end of an Ethernet cable to an Ethernet interface of the router and the other end to an Ethernet interfa...
Страница 113: ...p Procedure Check the following items after connecting Ethernet cables l Labels are correctly filled and securely attached to cables with texts facing the same direction l Cables and connectors are complete intact and tightly connected 5 6 4 Connecting Optical Modules and Optical Fibers Huawei AR500 AR530 AR550 series Industrial Switch Routers Hardware Installation and Maintenance Guide 5 Installi...
Страница 114: ...h an optical module into an optical interface until you hear a click NOTE If the optical module cannot be completely inserted into the optical interface do not force it into the interface Turn the optical module 180 degrees over and try again Step 2 Remove the dust plug from the optical module NOTE Place the dust plug in an appropriate place After optical fibers are removed from the optical module...
Страница 115: ...nge the optical fibers to make them parallel and bundle them with fiber binding tape at an interval of 150 mm to 300 mm Step 6 Replace all the temporary labels with formal labels on the optical fibers End 5 6 5 Connecting Boolean Output Cables Context DANGER To avoid electric shock do not connect power cables while the power is on Huawei AR500 AR530 AR550 series Industrial Switch Routers Hardware ...
Страница 116: ...pin Boolean output cables NOTE The three cables are connected to the 3 pin terminal block in the same way The following procedure uses one cable as an example 1 Use a wire stripper to peel about 7 mm length of insulation coating off one end of the cable NOTICE Do not cut the metal conductor of the cable when peeling insulation coating 2 Insert the bare wire into a wire hole Huawei AR500 AR530 AR55...
Страница 117: ...inal block to the Boolean output interfaces of the router and then tighten the slotted screws at both ends of the terminal block with a flat head screwdriver 2 Connect cables on the other to external digital input devices Huawei AR500 AR530 AR550 series Industrial Switch Routers Hardware Installation and Maintenance Guide 5 Installing an AR550 Series Industrial Switching Router Issue 05 2015 12 01...
Страница 118: ... is on NOTICE Do not power on a router before you finish installing the router and connecting cables Huawei AR500 AR530 AR550 series Industrial Switch Routers Hardware Installation and Maintenance Guide 5 Installing an AR550 Series Industrial Switching Router Issue 05 2015 12 01 Huawei Proprietary and Confidential Copyright Huawei Technologies Co Ltd 110 ...
Страница 119: ...that the ESD wrist strap is grounded and in a close contact with your wrist Step 3 Assemble the 2 pin DC power cables NOTE l Two cables are connected to the 2 pin terminal block in the same way The following procedure uses one cable as an example l Insert the two cables into the 2 pin terminal block with the RTN cable in the left hole and the NEG cable in the right hole 1 Use a wire stripper to pe...
Страница 120: ...of wire holes and bare wires on the 2 pin terminal block Step 4 Connect the 2 pin DC power cables Huawei AR500 AR530 AR550 series Industrial Switch Routers Hardware Installation and Maintenance Guide 5 Installing an AR550 Series Industrial Switching Router Issue 05 2015 12 01 Huawei Proprietary and Confidential Copyright Huawei Technologies Co Ltd 112 ...
Страница 121: ...ne cable as an example l Make an AC power input cable a Use a wire stripper to peel about 7 mm length of insulation coating off one end of the cable NOTICE Do not cut the metal conductor of the cable when peeling insulation coating NOTE Insert the three cables into the AC input terminal block from left to right in the sequence of live wire RTN neutral wire NEG and earth wire b Insert the bare wire...
Страница 122: ...oating NOTE Insert the two cables into the AC DC input terminal block with the positive cable in the leftmost hole and the negative cable in the second hole b Insert the bare wire into a hole on the terminal block Then the reed is closed to lock the cable in the hole Huawei AR500 AR530 AR550 series Industrial Switch Routers Hardware Installation and Maintenance Guide 5 Installing an AR550 Series I...
Страница 123: ... the slotted screws at both ends of the terminal block with the flat head screwdriver 2 Connect cables at the other end to an external power supply system 6U KX Y VVR_ Y_YZKS End 5 6 7 Connecting the 180 W PoE Midspan Huawei AR500 AR530 AR550 series Industrial Switch Routers Hardware Installation and Maintenance Guide 5 Installing an AR550 Series Industrial Switching Router Issue 05 2015 12 01 Hua...
Страница 124: ...pin AC input terminal block l Power cables five separately purchased l Network cables two for each PD separately purchased Procedure Step 1 Verify that the router is reliably grounded Step 2 Wear an ESD wrist strap Ensure that the ESD wrist strap is grounded and in a close contact with your wrist Step 3 Assemble the 2 pin DC power cables NOTE l Two cables are connected to the 2 pin terminal block ...
Страница 125: ...2 Insert the bare wire into a wire hole 3 Tighten the screw on the wire hole with a flat head screwdriver to lock the cable Huawei AR500 AR530 AR550 series Industrial Switch Routers Hardware Installation and Maintenance Guide 5 Installing an AR550 Series Industrial Switching Router Issue 05 2015 12 01 Huawei Proprietary and Confidential Copyright Huawei Technologies Co Ltd 117 ...
Страница 126: ...ock with a flat head screwdriver 2 Connect the 2 pin terminal block at the other end to the 2 pin DC output power socket of the 180 W PoE midspan and then tighten the slotted screws at both ends of the terminal block with the flat head screwdriver Huawei AR500 AR530 AR550 series Industrial Switch Routers Hardware Installation and Maintenance Guide 5 Installing an AR550 Series Industrial Switching ...
Страница 127: ...e cables into the AC input terminal block from left to right in the sequence of live wire RTN neutral wire NEG and earth wire 1 Use a wire stripper to peel about 7 mm length of insulation coating off one end of the cable Huawei AR500 AR530 AR550 series Industrial Switch Routers Hardware Installation and Maintenance Guide 5 Installing an AR550 Series Industrial Switching Router Issue 05 2015 12 01 ...
Страница 128: ...nput power cables 1 Insert the AC input terminal block to the AC input socket of the 180 W PoE midspan and then tighten the slotted screws at both ends of the terminal block with the flat head screwdriver 2 Connect AC cables at the other end to an external AC power supply system Huawei AR500 AR530 AR550 series Industrial Switch Routers Hardware Installation and Maintenance Guide 5 Installing an AR...
Страница 129: ... PoE midspan using a network cable 2 Connect an output GE interface of the 180 W PoE midspan to the PD using another network cable Huawei AR500 AR530 AR550 series Industrial Switch Routers Hardware Installation and Maintenance Guide 5 Installing an AR550 Series Industrial Switching Router Issue 05 2015 12 01 Huawei Proprietary and Confidential Copyright Huawei Technologies Co Ltd 121 ...
Страница 130: ...wer switch of the external power supply system to start the router After the router starts check indicators on the front panel to check whether the router runs normally Figure 5 1 describes the indicator states when the router is running normally Huawei AR500 AR530 AR550 series Industrial Switch Routers Hardware Installation and Maintenance Guide 5 Installing an AR550 Series Industrial Switching R...
Страница 131: ...stem is running properly l Power off the router Huawei AR500 AR530 AR550 series Industrial Switch Routers Hardware Installation and Maintenance Guide 5 Installing an AR550 Series Industrial Switching Router Issue 05 2015 12 01 Huawei Proprietary and Confidential Copyright Huawei Technologies Co Ltd 123 ...
Страница 132: ... up Procedure After the router starts you can log in to its CLI to configure manage and maintain the router For details see the CLI based Configuration Huawei AR500 AR530 AR550 series Industrial Switch Routers Hardware Installation and Maintenance Guide 5 Installing an AR550 Series Industrial Switching Router Issue 05 2015 12 01 Huawei Proprietary and Confidential Copyright Huawei Technologies Co ...
Страница 133: ...6 4 Appendix D Equipment Grounding Specifications 6 5 Appendix E Engineering Labels for Cables 6 6 Appendix F Guide to Using Optical Modules 6 7 Appendix G Fault Tag Huawei AR500 AR530 AR550 series Industrial Switch Routers Hardware Installation and Maintenance Guide 6 Appendix Issue 05 2015 12 01 Huawei Proprietary and Confidential Copyright Huawei Technologies Co Ltd 125 ...
Страница 134: ... the software l Steady red A fault or alarm that affects services has occurred and must be handled immediately l Off The system software is not running or is resetting Used as the USB indicator After a USB flash drive is installed the RUN ALM indicator fast blinks red for 3 seconds indicating that it enters the USB indicator mode In USB indicator mode l Steady green The system has been upgraded us...
Страница 135: ...on The router is powered on Off The router is powered off 3G 2G Indicator Table 6 4 describes the possible states of the 3G 2G indicator Table 6 4 Description of the 3G 2G indicator Silkscreen Color Description 3G 2G Green Steady on The 3G 2G link has been connected and is active dialup succeeded Fast blinking The 3G 2G link is transmitting and receiving data Off The 3G 2G link is not connected an...
Страница 136: ...dicator The ZigBee sub GHz indicator is a multiplexing indicator and can be used as either the ZigBee or sub GHz indicator at a time Table 6 6 describes the possible states of the ZigBee sub GHz indicator Table 6 6 Description of the ZigBee sub GHz indicator Silkscreen Color Description ZigBee sub GHz Green Steady on The ZigBee networking has been established successfully or the sub GHz antenna in...
Страница 137: ...d as the USB indicator Table 6 8 describes the possible states of the ALM indicator Table 6 8 Description of the ALM indicator Silkscreen Color Description ALM Red Used as the system indicator l Steady on A system fault has occurred and requires manual intervention l Off The system is running properly Used as the USB indicator Steady on The system failed to be upgraded using the USB flash drive RU...
Страница 138: ...g upgraded using the USB flash drive LAN FE Indicator Table 6 10 describes the possible states of an LAN FE indicator Table 6 10 Description of an LAN FE indicator Silkscreen Color Description LAN FE Green l Steady on The LAN FE interface is in Link Up state l Off The LAN FE interface is in Link Down state l Blinking The LAN FE interface is transmitting or receiving data WAN GE Combo Indicator Tab...
Страница 139: ...nected to the corresponding power socket or the power socket is not connected to any power source NOTE If the input voltage is below the minimum operating voltage for the router the router may not work normally even though the DC indicator is on PoE Indicator Table 6 13 describes the possible states of the PoE indicator Table 6 13 Description of the PoE indicator Silkscreen Color Description PoE G...
Страница 140: ...describes the possible states of a GE electrical interface indicator Table 6 15 Description of a GE electrical interface indicator Silkscreen Color Description GE electrical interface indicator Green Steady on The power supply level for PDs is 0 to 3 Off The router is not supplying power to PDs Orange Steady on The power supply level for PDs is 4 Off The router is not supplying power to PDs Signal...
Страница 141: ... SIM Green Steady on A SIM card is installed in the corresponding slot and is working normally Off No SIM card is installed in the corresponding slot SYS Indicator Table 6 18 describes the possible states of the SYS indicator Table 6 18 Description of the SYS indicator Silkscreen Color Description SYS Green Slow blinking The system is running properly Fast blinking The system is powering on or is ...
Страница 142: ...e indicate a larger received signal strength indicator RSSI value and higher signal strength Green Off No signal is available One indicator on The signal strength is low Two indicators on The signal strength is medium Three indicators on The signal strength is high GE Interface Indicator Table 6 21 describes possible states of a GE interface indicator Table 6 21 Description of a GE interface indic...
Страница 143: ...ectors that have dirt on their pins or in their jacks or if there are conductors between pins or between pins and the shell Precautions for Assembly l Use dedicated tools or tools delivered by Huawei and follow the methods given here during assembly l Hold terminals of cables instead of pulling the cables themselves when installing or removing cable components l Take the following precautions when...
Страница 144: ... different The figures in this document are for your reference only 6 2 2 Assembling Power Cables Assembling the OT Terminal and Power Cable Context Figure 6 1 shows the components of an OT terminal and a power cable Figure 6 1 Components of an OT terminal and a power cable A Heat shrinkable tubing B Bare crimping terminal C Insulation D Conductor Procedure Step 1 Based on the cross sectional area...
Страница 145: ...in 2 Value of L1 mm in 1 0 002 7 0 28 10 0 015 11 0 43 1 5 0 002 7 0 28 16 0 025 13 0 51 2 5 0 004 7 0 28 25 0 039 14 0 55 4 0 006 8 0 31 35 0 054 16 0 63 6 0 009 9 0 35 50 0 077 16 0 63 NOTE If you are proficient in assembling OT terminals and power cables you can obtain the value of L1 by comparing the part to be crimped with the power cable Step 2 Put the heat shrinkable A tubing onto the bare ...
Страница 146: ...parts of the bare crimping terminal and the conductor as shown in Figure 6 4 NOTE The shapes of crimped parts may vary with the crimping dies Figure 6 4 Crimping the joint parts of the bare crimping terminal and the conductor OT terminal Step 5 Push the heat shrink tubing A toward the connector until the tube covers the crimped part and then use a heat gun to heat the tube as shown in Figure 6 5 H...
Страница 147: ...l and Power Cable Context Figure 6 6 shows the components of a JG terminal and a power cable Figure 6 6 Components of a JG terminal and a power cable A JG terminal B Heat shrinkable tubing C Insulation layer of a power cable D Conductor of a power cable Huawei AR500 AR530 AR550 series Industrial Switch Routers Hardware Installation and Maintenance Guide 6 Appendix Issue 05 2015 12 01 Huawei Propri...
Страница 148: ...re 6 7 Stripping a power cable JG terminal Table 6 23 Mapping between the cross sectional area of the conductor and the value of L Cross Sectional Area of Conductor mm2 in 2 Value of L mm in 16 0 025 13 0 51 25 0 039 14 0 55 35 0 054 16 0 63 50 0 077 16 0 63 Step 2 Put the heat shrink tubing onto the bare crimping terminal as shown in Figure 6 8 Huawei AR500 AR530 AR550 series Industrial Switch Ro...
Страница 149: ...s shown in Figure 6 9 Figure 6 9 Crimping the joint parts of the bare crimping terminal and the conductor JG terminal Step 5 Push the heat shrink tubing toward the connector until the tube covers the crimped part and then use a heat gun to heat the tube as shown in Figure 6 10 Figure 6 10 Heating the heat shrink tubing JG terminal Huawei AR500 AR530 AR550 series Industrial Switch Routers Hardware ...
Страница 150: ...p 1 Strip a part of the insulation to expose the cable conductor with a length of L1 as shown in Figure 6 12 The recommended values of L1 are listed in Table 6 24 NOTICE When you strip a power cable do not damage the conductor of the cable Figure 6 12 Stripping a power cable cord end terminal Huawei AR500 AR530 AR550 series Industrial Switch Routers Hardware Installation and Maintenance Guide 6 Ap...
Страница 151: ...the conductor and ensure that the conductor is aligned with the edge of the cord end terminal as shown in Figure 6 13 NOTICE After the conductor is fed into the cord end terminal the protruding part of the conductor must not be longer than 1 mm 0 04 in Figure 6 13 Putting the cord end terminal onto the conductor Step 3 Crimp the joint parts of the cord end terminal and the conductor as shown in Fi...
Страница 152: ...ped Terminal W1 mm in 0 25 0 0004 1 0 04 0 5 0 0008 1 0 04 1 0 0 0015 1 5 0 06 1 5 0 0023 1 5 0 06 2 5 0 0039 2 4 0 09 4 0 006 3 1 0 12 6 0 009 4 0 16 10 0 015 5 3 0 21 16 0 025 6 0 24 25 0 039 8 7 0 34 35 0 054 10 0 39 End 6 2 3 Assembling Ethernet Cables Assembling the Shielded RJ45 Connector and Ethernet Cable Huawei AR500 AR530 AR550 series Industrial Switch Routers Hardware Installation and M...
Страница 153: ... the jacket of the connector onto the Ethernet cable as shown in Figure 6 16 Figure 6 16 Fitting the jacket of the connector onto the Ethernet cable Step 2 Remove a 30 mm 1 18 in long section of the jacket cut off the nylon twine inside the jacket and cut a no more than 5 mm 0 20 in cleft in the jacket as shown in Figure 6 17 Huawei AR500 AR530 AR550 series Industrial Switch Routers Hardware Insta...
Страница 154: ...e 6 18 Figure 6 18 Fitting the metal shell onto the twisted pair cable Step 4 Fit the metal shell onto the twisted pair cable until the shield layer is covered completely Along the edge of the metal shell cut off the aluminum foil shield layer and ensure that there is no surplus copper wire The exposed twisted pair cable is about 20 mm 0 79 in long as shown in Figure 6 19 Huawei AR500 AR530 AR550 ...
Страница 155: ...er C G Figure 6 21 Cable locations in a wire holder White Green Green White Orange Orange Blue White Blue White Brown Brown Step 6 Align the four pairs of cables in the holder as shown in Figure 6 22 The connections between the wires and the pins are shown in Figure 6 23 and listed in Table 6 26 Huawei AR500 AR530 AR550 series Industrial Switch Routers Hardware Installation and Maintenance Guide 6...
Страница 156: ...ctions between wires and pins using a straight through cable as an example Matching Pins of Wires Wire Color 1 White Orange 2 Orange 3 White Green 4 Blue 5 White Blue 6 Green 7 White Brown Huawei AR500 AR530 AR550 series Industrial Switch Routers Hardware Installation and Maintenance Guide 6 Appendix Issue 05 2015 12 01 Huawei Proprietary and Confidential Copyright Huawei Technologies Co Ltd 148 ...
Страница 157: ...that the wire holder is in good contact with the connector body Figure 6 25 Putting the connector body onto the wire holder Step 9 Push the metal shell toward the connector body until the wire holder and the connector body are engaged completely Crimp the connector as shown in Figure 6 26 Huawei AR500 AR530 AR550 series Industrial Switch Routers Hardware Installation and Maintenance Guide 6 Append...
Страница 158: ...p 11 To complete the assembly of the other end repeat Step 1 through Step 10 End Assembling an Unshielded RJ45 Connector and Ethernet Cable Context Figure 6 28 shows the components of an unshielded RJ45 connector and cable Huawei AR500 AR530 AR550 series Industrial Switch Routers Hardware Installation and Maintenance Guide 6 Appendix Issue 05 2015 12 01 Huawei Proprietary and Confidential Copyrigh...
Страница 159: ... twisted pair cable unit mm in Step 2 Align the four pairs of wires and cut the ends neatly as shown in Figure 6 30 The connections between the wires and the pins are listed in Table 6 27 Figure 6 30 Connections between wires and pins unit mm in C 16 White Orange White Green Orange Blue White Blue Green White Brown Brown Pin 8 Pin 1 Huawei AR500 AR530 AR550 series Industrial Switch Routers Hardwar...
Страница 160: ...e that the cable is completely seated in the plug Figure 6 31 Crimping the connector Step 4 To complete the assembly of the other end repeat Step 1 through Step 3 End Checking the Appearance of Contact Strips Context l To ensure proper contact between the crimped wires and the wire conductors the heights and sizes of the contact strips must be standard and the same Huawei AR500 AR530 AR550 series ...
Страница 161: ...m must be less than 0 5 mm 0 02 in Procedure Step 1 Hold the crimped connector with the front side facing you and check whether the contact strips are of the same height The height should be 6 02 0 13 mm 0 237 0 005 If a measuring tool is not available you can compare the connector with a standard connector Figure 6 32 shows an unqualified piece and Figure 6 33 shows a qualified piece NOTE All unq...
Страница 162: ...gure 6 35 shows an unqualified piece Figure 6 35 Dirt on a contract strip Step 4 Check whether the contact strips and the plastic separators are well aligned and intact If a separator is skewed and cannot be fixed replace it with a new RJ45 connector Figure 6 36 shows an unqualified piece Figure 6 36 Skewed plastic separators Huawei AR500 AR530 AR550 series Industrial Switch Routers Hardware Insta...
Страница 163: ...aight through cables and crossover cables l Straight through cables are connected in a one to one manner They are used to connect terminals such as a computer or switch to network devices Table 6 28 lists the connections of core wires in a straight through cable Table 6 28 Connections of core wires in a straight through cable RJ45 Connector 1 RJ45 Connector 2 Core Wire Color Twisted or Not 2 2 Ora...
Страница 164: ...nector Figure 6 38 Pins of an RJ45 connector Pin8 Pin1 Procedure Step 1 Feed both connectors of the cable into the ports of the cable tester Step 2 After the connectors are properly inserted turn on the tester If the indicators from 1 to G turn on simultaneously you can infer that the pins work normally and the wires are correctly connected NOTE Turn the switch to the S position to slow down light...
Страница 165: ...on which depends on the wire connections of a crossover cable The Ethernet cable is qualified if the indicators turn on in the following sequence At the master left section of the tester the indicators turn on in the sequence of 1 8 G At the slave right section of the tester the indicators turn on in the sequence of 3 6 1 4 5 2 7 8 G If the indicators do not come on in this sequence the Ethernet c...
Страница 166: ...his document the adapters of cable connectors have separate interfaces In the actual situation the adapters may have interfaces fixed on equipment Use dedicated tools provided or specified by Huawei and follow the installation procedure described here Bending Radius Unless otherwise specified bending radius R of cables or fibers must meet the requirements listed in Table 6 30 Huawei AR500 AR530 AR...
Страница 167: ... l When removing densely aligned cables or fiber connectors use dedicated pliers such as cable pulling pliers and fiber pulling pliers l Do not twist bend stretch or extrude fibers during installation l Cover the idle fiber connectors with dust caps Remove the dust caps before using the fiber connectors Requirements for Cable Routing l To protect cables remove the burrs in the cable through holes ...
Страница 168: ...shown in Figure 6 43 where A is correct and B is incorrect Figure 6 43 Installing an OT terminal showing the orientation of crimping sleeve b Place the spring washer and flat washer in turn mount a matching screw and fasten it clockwise as shown in Figure 6 44 Huawei AR500 AR530 AR550 series Industrial Switch Routers Hardware Installation and Maintenance Guide 6 Appendix Issue 05 2015 12 01 Huawei...
Страница 169: ...nals on a post ensure that the two terminals can be installed on the post and that the electrical connecting pieces have a large contact area Two OT terminals can be installed using any of these methods Bend the upper OT terminal at a 45 or 90 degree angle as shown in Figure 6 46 Cross the two terminals as shown in Figure 6 47 Huawei AR500 AR530 AR550 series Industrial Switch Routers Hardware Inst...
Страница 170: ... loosen the screw counterclockwise End Installing the Cord End Terminal Procedure Step 1 Hold a cord end terminal upright and place it on a terminal jack as shown in Figure 6 48 To ensure bump contact and dense connection place the plain side of the terminal outwards Huawei AR500 AR530 AR550 series Industrial Switch Routers Hardware Installation and Maintenance Guide 6 Appendix Issue 05 2015 12 01...
Страница 171: ...n 2 mm 0 079 in in length l Do not press the insulation of the terminal l Insert only one terminal into one jack Step 3 Move the cable slightly and ensure that it is securely connected Step 4 Before you remove a cord end terminal loosen the screw counterclockwise End Installing Ethernet Adapters Huawei AR500 AR530 AR550 series Industrial Switch Routers Hardware Installation and Maintenance Guide 6...
Страница 172: ...eding the male shielded connector into the female shielded connector Step 3 When you hear a click the cable connector is completely inserted in the port The clip on the cable connector pops up to fix the connector in the port Pull the connector slightly and ensure that it is securely connected as shown in Figure 6 52 Huawei AR500 AR530 AR550 series Industrial Switch Routers Hardware Installation a...
Страница 173: ...net connector End Installing an Unshielded Ethernet Connector Procedure Step 1 Hold the male and female connectors with the male connector facing the female connector as shown in Figure 6 54 Huawei AR500 AR530 AR550 series Industrial Switch Routers Hardware Installation and Maintenance Guide 6 Appendix Issue 05 2015 12 01 Huawei Proprietary and Confidential Copyright Huawei Technologies Co Ltd 165...
Страница 174: ...k indicates that the connector is locked by the locking key Pull the connector slightly and ensure that it is securely connected Figure 6 56 shows an installed Ethernet connector Figure 6 56 Installed unshielded Ethernet connector Huawei AR500 AR530 AR550 series Industrial Switch Routers Hardware Installation and Maintenance Guide 6 Appendix Issue 05 2015 12 01 Huawei Proprietary and Confidential ...
Страница 175: ... a dedicated tool if the connectors are densely installed Cleaning Fiber Connectors Procedure Step 1 Clean the pins of a fiber connector by using lint free cotton and alcohol Step 2 Clean the pins again by using dust free cotton If necessary clean the pins by using an air gun Ensure that the pins are free from any fiber or debris End Installing an FC Fiber Connector Huawei AR500 AR530 AR550 series...
Страница 176: ...onnector and gently push the male connector until it is completely seated in the female connector as shown in Figure 6 59 Figure 6 59 Feeding the male connector into the female connector Step 4 Fasten the locking nut clockwise and ensure that the connector is securely installed as shown in Figure 6 60 Huawei AR500 AR530 AR550 series Industrial Switch Routers Hardware Installation and Maintenance G...
Страница 177: ...lling an LC Fiber Connector Procedure Step 1 Remove the dustproof cap of the LC fiber connector and store it for future use Step 2 Align the core pin of the male connector with that of the female connector as shown in Figure 6 62 Huawei AR500 AR530 AR550 series Industrial Switch Routers Hardware Installation and Maintenance Guide 6 Appendix Issue 05 2015 12 01 Huawei Proprietary and Confidential C...
Страница 178: ...n in Figure 6 63 Figure 6 63 Feeding the male connector into the female connector Step 4 A clicking sound indicates that the male connector is locked as shown in Figure 6 64 Figure 6 64 Installed LC connector Huawei AR500 AR530 AR550 series Industrial Switch Routers Hardware Installation and Maintenance Guide 6 Appendix Issue 05 2015 12 01 Huawei Proprietary and Confidential Copyright Huawei Techn...
Страница 179: ...n Figure 6 66 Figure 6 66 Aligning the male connector with the female connector Step 3 Feed the fiber connector into the female connector with your fingers holding the shell of the fiber connector not the pigtail When you hear a click the fiber connector is secured by the clips internal parts not illustrated in the figure Pull the fiber connector gently If the connector does not loosen the install...
Страница 180: ...68 Figure 6 68 Disassembling an SC fiber connector End Installing an MPO Connector Procedure Step 1 Remove the dustproof cap of the MPO fiber connector and store it for future use Step 2 Align the core pin of the male connector with that of the female connector as shown in Figure 6 69 Huawei AR500 AR530 AR550 series Industrial Switch Routers Hardware Installation and Maintenance Guide 6 Appendix I...
Страница 181: ... securely installed as shown in Figure 6 70 Figure 6 70 Installed MPO fiber connector Step 4 To disassemble an MPO fiber connector hold the shell labeled PULL and remove the male connector as shown in Figure 6 71 Huawei AR500 AR530 AR550 series Industrial Switch Routers Hardware Installation and Maintenance Guide 6 Appendix Issue 05 2015 12 01 Huawei Proprietary and Confidential Copyright Huawei T...
Страница 182: ...Figure 6 72 Figure 6 72 Loosening two fastening screws Step 2 Hold the handles of the COAX crimping tools to open the self locking mechanism The jaw of the COAX crimping tools opens automatically as shown in Figure 6 73 Huawei AR500 AR530 AR550 series Industrial Switch Routers Hardware Installation and Maintenance Guide 6 Appendix Issue 05 2015 12 01 Huawei Proprietary and Confidential Copyright H...
Страница 183: ...e COAX crimping tools Step 4 Place the mold to be installed into the jaw of the COAX crimping tools and align the screw holes as shown in Figure 6 75 Huawei AR500 AR530 AR550 series Industrial Switch Routers Hardware Installation and Maintenance Guide 6 Appendix Issue 05 2015 12 01 Huawei Proprietary and Confidential Copyright Huawei Technologies Co Ltd 175 ...
Страница 184: ...e jaw completely Align the screw holes as shown in Figure 6 76 Figure 6 76 Aligning the screw holes Step 6 Hold the handles of the COAX crimping tools with one hand Tighten the two fastening screws clockwise Figure 6 77 and Figure 6 78shows the mold installed in the COAX crimping tool Huawei AR500 AR530 AR550 series Industrial Switch Routers Hardware Installation and Maintenance Guide 6 Appendix I...
Страница 185: ...eismic power supply and transportation factors Construction structure heating and ventilation power supply lighting and fire proof construction of the equipment room should be designed by specialized construction designers to suit the environmental requirements of devices The equipment room should also follow local regulations concerning the industrial construction environmental protection fire sa...
Страница 186: ...he construction material Otherwise equipment suitable for wet conditions must be used l The doors and windows of the equipment room must be kept closed to maintain an airtight room l Using steel doors to ensure sound insulation is recommended l No cracks or openings are allowed on the walls or floors The outlet holes on the walls or windows must be sealed Walls must be constructed such that they a...
Страница 187: ...ments Area The smallest area of the equipment room can accommodate the equipment with the largest capacity Net height The minimum height of the equipment room should not be less than 3 m 9 84 ft The minimum height of the equipment room is the net height below overhead beams or ventilation pipes Floor The floor in the equipment room should be semi conductive and dustproof A raised floor with an ESD...
Страница 188: ...ements of device arrangement Water pipe Do not pass service pipes drainpipes and storm sewers through the equipment room Do not place a fire hydrant in the equipment room but place it in the corridor or near the staircase Internal partition wall Separate the area where the equipment is installed from the equipment room door The partition wall can block some outside dust Installation position of th...
Страница 189: ... µm precipitable dust diameter 150 µm Take the following measures to meet the requirements l Use dustproof materials for ground wall and ceiling construction l Use screens on the door and windows facing outside The outer windows should be dust proof l Clean the equipment room regularly and clean the air filter monthly l Wear shoe covers and ESD clothing before entering the equipment room Requireme...
Страница 190: ...nals Use ESD worktables l Keep non ESD materials such as common bags foam and rubber at least 30 cm 11 81 in away from boards and ESD sensitive components Electromagnetism Requirements for the Equipment Room All interference sources inside or outside the equipment room can cause equipment problems with capacitive coupling inductive coupling electromagnetic wave radiation and common impedance inclu...
Страница 191: ...d positive pole of the 48 V DC power supply or the negative pole of the 24 V DC power supply with the indoor collective ground cable nearby The total ground cable should meet the maximum load of the equipment l The power equipment must have a DC working ground cable which can connect the power equipment to the collective ground cable of the telecommunication site or the protective ground bar of th...
Страница 192: ...om power cables and surge protection devices Collective ground cable l Use a ground ring or ground bar for the collective ground cable l Do not use aluminum cables as ground cables Adopt measures to prevent electrification corrosion when connecting different metal parts together l Use a copper busbar as the collective ground cable with a cross sectional area of no less than 120 mm2 0 19 in 2 or us...
Страница 193: ...ground terminals l The fiber reinforcing rib can be directly connected to the ground bar of the cabinet Before wrapping the reinforcing rib with insulation tape cut a 0 5 m 1 64 ft segment from the reinforcing rib Wrap the reinforcing rib with at least five layers of insulation tape Keep the reinforcing rib at least 5 cm 1 969 in from the cabinet surface 6 3 2 Requirements for Power Supply Require...
Страница 194: ...ns that supply power directly to devices exceeds the rated voltage by 10 to 5 or exceeds the voltage range that devices can support a voltage regulating device or voltage stabilizing device is required l If the mains do not supply power for the device directly or if the mains voltage exceeds the rated voltage by 15 to 10 or exceeds the input voltage range of the DC power supply a voltage regulatin...
Страница 195: ...ange of the input voltage 9 6 V to 60 V DC power capacity to support the surge current Greater than 1 5 times the rated current Regulated voltage precision If the AC input voltage is in the range of 85 to 110 of the rated value and the load current is in the range of 5 to 100 of the rated value the output voltage of the rectifier ranges from 46 0 V to 56 4 V with the regulated voltage precision le...
Страница 196: ...cluding the shielded ground and the lightning proof ground of the cable distribution frame should share the same grounding conductor 2 The cable trays shells metal ventilation pipes metal doors and windows in the equipment room should be grounded for protection 3 The metal parts of the equipment which are electrically floating in normal conditions should be grounded for protection 4 The ground cab...
Страница 197: ...mm 1 18 in x 1 97 in around the connection hole for a captive bolt Measures to prevent rust and corrosion must be taken for this area Zinc electroplating with iridescent yellow chromate conversion coating should be applied to the gasket and nut to ensure good electrical contact 6 When combining cabinets of the same type short circuiting cables are required to connect the ground busbars if any of t...
Страница 198: ... cables inside the equipment room install surge protection devices at the interface to the equipment The PGND cable for the surge protection devices should be as short as possible 2 The incoming and outgoing signal cables to and from the office and unused wires inside the cable should be grounded for protection 3 The Tone Data Access TDA cable must pass through the Main Distribution Frame MDF with...
Страница 199: ...e correct and orderly connection of cables and easy maintenance after installation Engineering labels are specialized for power cables and signal cables l Signal cables include network cables optical fibers and user cables l Power cables include the AC power cables and DC power cables NOTE Fill in labels according to specified requirements to keep consistency of labels in the equipment room Make a...
Страница 200: ...cable and its size is 1 mm x 2 mm 0 04 in x 0 08 in The word TO upside down in the figure at the lower right corner of the label is used to identify the opposite end of the cable on which the label is affixed Power Cable Label The label for power cables should be attached to the identification plate on the cable ties that are attached to the cable The identification plate has an embossed area 0 2 ...
Страница 201: ...wei local office to print labels The template is made in Microsoft Word Follow these instructions to use the template l You can modify the contents of the template Do not change settings of centered characters direction and fonts Huawei AR500 AR530 AR550 series Industrial Switch Routers Hardware Installation and Maintenance Guide 6 Appendix Issue 05 2015 12 01 Huawei Proprietary and Confidential C...
Страница 202: ...ectly If the printout conforms to the sheet of labels print the labels on the label paper If the printout does not conform adjust the page setup and try printing again until the correct printout is produced The method for adjusting the page setup is as follows 1 Select File Page Setup 2 Select Layout and set Header and Footer as 0 3 Select the Margins tab page Select Left for Gutter Position and a...
Страница 203: ...the space bar to move the text to the next line Writing Labels Writing Tools To make sure the printouts are clear and legible use black markers instead of ball point pens to write the labels If no marker is available black ball point pens are allowed although not recommended Compared with ball point pens water proof markers are better When writing with a ball point pen do not leave the oil on the ...
Страница 204: ...ble bending or affecting other cables other positions are allowed to attach the labels The rectangular part with text is attached facing right or downward as shown in Figure 6 85 The details are as follows The identification card is to the right of the cable in vertical cabling The identification card should be downward when you lay out the cable horizontally Figure 6 85 Text area of the label l P...
Страница 205: ...und on both ends of a cable After the bundling the finished identification plate should be on top of the cable in horizontal cabling or on the right side of the cable in vertical cabling as shown in Figure 6 87 The details are as follows l The identification card is to the right of the cable in vertical cabling l The identification card is on the top of the cable in horizontal cabling Make sure th...
Страница 206: ...he location of the ports connected to both ends of the cable Figure 6 88 shows the information on both sides of the labels affixed to the signal cables l Area 1 contains the location information of the local end of the cable l Area 2 with the word TO contains the location information of the opposite end of the cable l Area 3 has been folded up inside the label Figure 6 88 Printed parts on the labe...
Страница 207: ...n the boards in a chassis or on the device boxes There are two types of labels for optical cables l One is for the fiber that connects the optical interfaces on two devices l The other is for the fiber that connects the device and the ODF Labels for the Optical Fibers Connecting Devices Meaning of the Label Table 6 43 lists information on both sides of the labels affixed to the optical fibers that...
Страница 208: ...ndicates that the opposite end of the optical fiber is connected with optical transmitting interface 01 in slot 01 chassis 01 in the cabinet in row G column 01 in the machine room Labels for the Optical Fibers Connecting the Device and an ODF Meaning of the Labels Table 6 44 shows information on both sides of labels attached to an optical fiber between a device and an optical distribution frame OD...
Страница 209: ...e cabinet columns from left to right are numbered from 01 to 99 For example G01 is the ODF of row G and column 01 B row number of the terminal device Range from 01 to 99 for example 01 01 C column number of the terminal device R Optical receiving interface T optical transmitting interface Example of the Label Figure 6 90 shows a sample label on an optical fiber Figure 6 90 Sample label on an optic...
Страница 210: ...rst cabinet in row A B chassis number Numbered in bottom up order with two digits for example 01 C physical slot number Numbered with two digits in top down and left right order For example 01 D network port number Numbered in top down and left right orders For example 01 MN Z MN cabinet number For example B02 is the second cabinet in row B Z Location number Fill in the location number of the term...
Страница 211: ... Example Figure 6 91 shows a sample label on an Ethernet cable Figure 6 91 Sample label on an Ethernet cable A01 TO 03 01 01 B02 03 01 Meaning of the label in Figure 6 91 l A01 03 01 01 indicates that one end of the network cable is connected to network interface 01 in slot 01 chassis 03 of the cabinet in row A column 01 in the equipment room l B02 03 01 indicates that another end of the network c...
Страница 212: ...lumn number of the terminal device Example of the Label Figure 6 92 shows a sample label on a user cable Figure 6 92 Sample label on a user cable A01 TO 03 01 01 MDF G01 01 01 The meaning of the label in Figure 6 92 is as follows l A01 03 01 01 indicates that the local end of the user cable is connected to port 1 in slot 1 chassis 03 of the cabinet in row A column 01 in the equipment room l MDF G0...
Страница 213: ... or the connector can be identified without them BC can be omitted It is unnecessary to identify the row and column number for BGND and PGND MN BC B BGND MN BC B PGND The label only carries location information about the destination direction of the power cable whereas information about the local end is unnecessary That is the label only carries location information about the opposite equipment th...
Страница 214: ...ould be given in a similar way Engineering Labels for AC Power Cables These labels are affixed to both ends of an AC power cable that provides AC power supply to cabinets including 110 220 V PGND and BGND cables The 110 220 V AC cables and related PGND and BGND cables are covered with an insulating sheath so the labels need to contain only the word AC and the cabinet numbers The labels for AC powe...
Страница 215: ...e is not completely installed in position and the latch boss is not secured the device cannot identify the optical module After the optical module works for a long time it will be ejected under external stress 2 The optical receptacle on an optical module is contaminated If an optical module is not cleaned or protected properly contaminants may accumulate on the fiber pin in the optical module As ...
Страница 216: ...alled in position If the optical module cannot be pulled out it is secured Figure 6 95 State of the release handle Close the release handle Open the release handle Measures to Prevent Receptacle Contamination 1 Cleaning tissues must be prepared on site You need to clean the optical connector before inserting it in the receptacle This protects the receptacle against contamination on the surface of ...
Страница 217: ...ck or coil them in a fiber management tray to prevent fibers from being squeezed Figure 6 99 Installing a protective cap on a fiber 4 If a receptacle or an optical connector has not been used for a long time and is not covered with a protective cap you need to clean it before using it Clean a receptacle with a cotton swab as shown in Figure 6 100 Clean an optical connector with cleaning tissues Hu...
Страница 218: ...be burnt 2 When performing a self loop test use an optical attenuator Do not loosen the optical connector instead of the optical attenuator Precautions 1 The optical connector should be vertically inserted in the receptacle to avoid damages to the receptacle 2 Fibers must be inserted into optical modules of the corresponding type That is multimode fibers must be inserted into multimode optical mod...
Страница 219: ...thers F011 Running circumstance change Note l For optical interface cards returned the optical interfaces should be covered with protection caps l In general the analysis card will not be returned to you If you have any special requirements please contact Huawei l One Fault Tag should be adapted in one return category such as RMA Return Analysis l The items marked with are the mandatory fields tha...