7.10.2 Data Sheet for NodeB Commissioning
This section provides the data sheet that is used to record the process and results of the NodeB
commissioning
Table 7-6
Data sheet for NodeB commissioning
Site Name
NodeB Type
Commission Time
Commissioning
Engineer
Commissioning Mode
□
Local USB + remote commissioning
□
SMT/LMT + remote
commissioning
□
Remote commissioning
Commissioning
Result
□
Successful
□
Failed
Commissioning Item
Conclusion
Handling
Exceptional Case
Commissioning
Preparation Phase
Faults in the NodeB hardware
installation are rectified.
□
Yes;
□
No
Transmission links between
the NodeB and RNC are
ready.
□
Yes;
□
No
Negotiation data of the NodeB
to be commissioned is added
to the RNC.
□
Yes;
□
No
Commission
ing Phase
Local
Com
missio
ning
throug
h USB
The NodeB is upgraded.
□
Yes;
□
No
The NodeB hardware is
functional.
□
Yes;
□
No
7 Commissioning the MBTS by Using Local Maintenance
Terminal and M2000
3900 Series Multi-Mode Base Station
Commissioning Guide
7-44
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
Issue 02 (2010-07-30)