WenZhou ZhengBang Electronic Equipment Co., Ltd
ZB4050LS Rev 1.1
32
Chapter 5 Production & Placement
Process
:
!
DANGER
:
Start running immediately after the device is turned on, to avoid injury! Never put your hands and head into
the machine work area.
!
Attention
:
To ensure the accuracy of the device data, the reset operation will be performed after each startup.
5-1 How to import program
1
、
Import program
:
Click “ Production ”→“ Program ”
,
import the program that need to be processed.
Fig.5-1 Imput Program
2.
Match Parameter
:
Automatically generate a production list after importing the program and automatically match the corresponding
feeder number and nozzle number
No.
Process
Content
1
Boot
Turn on the Device and enter system(Detail in the boot ready)
2
Origin Reset
Automatic
3
PCB Load
Adjust the rail width and load the PCB
4
Trans Mode Setting
Set mode based on requirements(Automatic & Manual)
5
Program Import
Import the edited production placement program
6
Material Load
Load material based on file station allocation date
7
Mount
Start mounting
8
Ending
End the system and cut off the power
9
Daily Maintenance
Daily maintenance as required
Содержание ZB4050LS
Страница 1: ...WenZhou ZhengBang Electronic Equipment Co Ltd ZB4050LS Rev 1 1 ...
Страница 45: ...42 ...