23
LP-542 REV. 6.2.16
Vent adaptors are not designed as load-bearing devices, and must not be used to support exhaust vent piping. All vent pipes must be
properly connected, supported, and the exhaust
must be pitched a minimum of ¼” per foot back to the boiler to allow drainage of
condensate. Failure to properly support vent piping and follow the information in this statement could result in product damage, severe
personal injury, or death.
D. TIGHTENING BOILER COLLAR TO EXHAUST VENT AND INTAKE PIPE
NOTE:
The included 6” length of 3” CPVC pipe MUST BE INSTALLED in the exhaust vent connection BEFORE venting the
boiler.
Failure to properly install the included 6” length of 3” CPVC pipe BEFORE venting the boiler could result in product damage, severe
personal injury, or death.
This boiler
uses 3” diameter adapters for exhaust vent and intake pipe. In order to use 2” pipe, it is required to reduce pipe size in a
vertical length of pipe with a reducing coupling (not included).
Follow the steps below to install 3” pipe into the boiler adapter. See
Figure 7 for details.
1. Clean and dry the boiler connection. DO NOT use primer or cement on the boiler connection.
2. Push the
included 6” length of CPVC pipe into the connection until it touches the bottom of the fitting.
3. Tighten the clamps using a screwdriver.
4. Ensure the pipe is secure before continuing installation.
5.
For 2” installations, install a reducing coupling in a vertical section of pipe. See Figure 8.
Figure 7
– Installing the 6” Length of CPVC into the Exhaust Vent Connection
Figure 8
– Transitioning from 3” to 2” Vent Pipe
Содержание UFT-100W
Страница 47: ...47 LP 542 REV 6 2 16 Figure 38 Electrical Wiring Diagram ...
Страница 48: ...48 LP 542 REV 6 2 16 Figure 39 Ladder Diagram ...
Страница 87: ...87 LP 542 REV 6 2 16 ...
Страница 88: ...88 LP 542 REV 6 2 16 ...
Страница 89: ...89 LP 542 REV 6 2 16 MAINTENANCE NOTES ...