6
Preparation for commissioning
The chapter covers activities and tests before commissioning.
6.1
Filling the transformer
As long as the operating temperature of the bushing is not exceeded, the transformer can be
evacuated for any desired period (if necessary).
► If necessary, evacuate the transformer.
► Fill the transformer with oil.
6.2
Venting the bushing
NOTICE
Material damage caused by air in the bushing
Air in the bushing can endanger operation and can damage the bushing.
► Vent the bushing with the help of air release screws (positions: see bushing
specification).
Fig. 16: Air release screws
Item
Part
Item
Part
1
Air release screw head
3
Air release screw flange
2
Screw for dry filling
Range STARIS®-Sia+