Installation
VK 5012
Issued 06/2005
4.2
1
For the transport to the installation site, the baling press must be jacked up at the
legs (1) on both sides.
Position heavy-duty rollers (2) on the left and the right beneath the T-beams and put
one square timber (3) onto it, ranging the whole width.
3
2
Lower the press again and lift it in front of press channel with fork lift truck.
Now the baling press can be pushed or drawn with the lift truck to the installation
site.
Содержание VK 5012
Страница 16: ...6 417 999 120 Issued 06 2005 General information VK 5012 2 4 ...
Страница 17: ...6 417 999 120 Issued 06 2005 VK 5012 Technical data 3 1 3 Technical data 3 1 Dimensions ...
Страница 24: ...6 417 999 120 Issued 06 2005 Technical data VK 5012 3 8 ...
Страница 28: ...6 417 999 120 Installation VK 5012 Issued 06 2005 4 4 ...
Страница 64: ...6 417 999 120 Installation VK 5012 Issued 06 2005 5 36 ...
Страница 92: ...Spare parts and accessories VK 5012 6 417 999 120 Issued 06 2005 7 2 ...
Страница 94: ......
Страница 95: ......
Страница 96: ......