Installation Manual
Lithium Battery Systems TL Series
VHR TL4850LFP, VHR TL4880LFP, VHR TL48100LFP, VHR
TL48100LFP-3U, VHR TL48150LFP, VHR TL48200LFP
Страница 1: ...Installation Manual Lithium Battery Systems TL Series VHR TL4850LFP VHR TL4880LFP VHR TL48100LFP VHR TL48100LFP 3U VHR TL48150LFP VHR TL48200LFP...
Страница 2: ...d and operated by professionals Preparation for Installation Batteries shall not be placed in direct sunshine or close to heat source Batteries shall be installed in place with good ventilation to ass...
Страница 3: ...of Battery Modules Battery modules of TL LFP series are applicable for installation in 19 inch cabinets Cabinet Information 19 inch Standard Cabinet Dimensions 600mm L x 600mm W x 1000mm H Step 1 Secu...
Страница 4: ...Smart Energy Solutions for a Cleaner World 4 7 Step 2 Place the module onto the shelf and push the module into the cabinet...
Страница 5: ...7 Step 3 After the module is placed inside the cabinet secure tight the module front panel to the 19 rails of the cabinet using M6 bolts Step 4 Install remaining battery modules as per the steps above...
Страница 6: ...of each module with the bottom end of positive output cables Direct the positive cable up towards the cabinet s top panel along the side panel as shown on the picture below left through one of two cab...
Страница 7: ...l along the side panel as shown on the picture below left through one of two cable holes in the top panel of the cabinet Then connect the top end of the negative output cables firmly by bolt to the ne...
Страница 8: ...unication lines between modules Reserve one communication line in the top module for connection with PCS Step 10 IMPORTANT Connect firmly each module s front panel to the 19 rack of the cabinet by ear...
Страница 9: ...r a Cleaner World ZHEJIANG HENGRUI TECHNOLOGY CO LTD 8F Building 3 Tianxing International Center No 508 Fengtan Road Hangzhou China 310011 Tel 86 571 88189800 Fax 86 571 87896688 Website www hresys co...