background image

Earthed Metal Back Plate

 

to suit HL/HEE Flush Load Centres

Cat. HL12FS-BP, HEE18FS-BP, HL24FS-BP, HL36FS-BP, HL48FS-BP

Instruction Manual

1

Range

Reference : AS3000:2007 wiring rules requirement  (Clause : 3.9.4.4 (b).

2

3

Standards

Step 1: 

Position the plate so that 

overhang is on the side of the 

incoming cable. Mark drilling 

holes to fix the plate on back of 

the enclosure with the help of 

pre-drilled holes on back plate 

(5 holes to mark : 4 c 

earth).

Part No

(mm)

(mm)

Thickness 

(mm)

to suit 

enclosure

HL12FS-BP

425

265

0.9

HL12F

HEE18FS-BP

367

384

0.9

HEE18F

HL24FS-BP

550

265

0.9

HL24F

HL36FS-BP

675

265

0.9

HL36F

HL48FS-BP

800

265

0.9

HL48F

B

A

Installation

Step 2:

Drill with 4mm bit on back of the 

enclosure.

Step 3: 

Fix back plate to enclosure using 

bolts, washers & nuts provided. 

Make sure the overhang is 

covering unprotected cables (top 

or bottom). 

Step 4:

Fix 4mm² earth strap to the earth 

bar and stud (overhang portion on 

the side of the earth terminal) 

Metal plate back

Flush enclosure

Отзывы: