6.
When the switch is in place, secure the inner rails to the outer rails by tightening the screws at the
rear of the rack.
7.
At the front of the rack, run the switch power cords from the sides of the rack through the cutouts in
the rail, and then connect them to the switch power supplies. Connect two power cords to the
SN6600B 64-port switch.
IMPORTANT:
Make sure that the power cords do not come in contact with any sharp edges.
1. Cutouts for power cords
2. Power cable plugs
3. Power switches
4. Plenum thumb screws
Figure 10: Connecting power and installing the plenum
8.
Connect the other end of the power cords to power sources on separate circuits to protect against
AC failure. (Make sure that two power cords are connected to the SN6600B 64-port switch.)
9.
Power on the power supplies by setting the power switches to the ON (
I
) position.
The power supply LEDs are amber until the Power On Self Test (POST) is complete, and then
change to green. The HPE StoreFabric SN6600B 32Gb FC Switch takes several minutes to boot and
complete POST.
NOTE:
When installed, the plenum covers the power supply switches and LEDs. However, the LEDs
are visible through the air holes in the front of the plenum.
10.
Slide the plenum over the nonport side of the inner rails, taking care to bypass the power cables.
11.
Tighten the thumbscrews to secure the plenum to the front of the rack.
12.
Proceed to
Setting up the switch
on page 16.
Installing a standalone switch
To install the HPE StoreFabric SN3600B 32Gb FC Switch or HPE StoreFabric SN6600B 32Gb FC Switch
as standalone switch, follow the steps:
1.
Unpack the switch and verify the contents.
2.
To prevent the switch from sliding off the supporting surface, apply the adhesive rubber feet as follows:
14
Installing a standalone switch