46
User Manual
2.6.2.5 SN2010M Splitting Options
2.7
Initial Power On
Each system’s input voltage is specified in the
chapter. The power cords should
be standard 3-wire AC power cords including a safety ground and rated for 15A or higher.
Step 1.
Plug in the first power cable.
Step 2.
Plug in the second power cable.
Step 3.
Wait for the System Status LED to turn green.
Step 4.
Check the System Status LEDs and confirm that all of the LEDs show status lights consis-
tent with normal operation (initially flashing, and then moving to a steady color) as shown
in
below. For more information, refer to
.
The system platform will automatically power on when AC power is applied. There is
no power system. Check all boards, power supplies, and fan tray modules for proper
insertion before plugging in a power cable.
It may take up to five minutes to turn on the system. If the System Status LED shows
red after five minutes, unplug the system and call your HPE representative for assis-
tance.
Содержание SN2100M
Страница 42: ...42 User Manual Figure 42 SN2010 SFP Cable Orientation Figure 43 SN2410M SN2410bM Cable Orientation ...
Страница 70: ...70 User Manual Figure 76 SN2010M Pull out Tab ...
Страница 98: ...98 User Manual 24 China CCC Warning Statement 25 Taiwan BSMI Class A Statement Warning to the User ...