Procedure
2. Remove all power:
a. Disconnect each power cord from the power source.
b. Disconnect each power cord from the server.
3. Access the product rear panel.
4. Remove the power supply.
WARNING: To reduce the risk of personal injury from hot surfaces, allow the power supply or power supply
blank to cool before touching it.
To replace the component, reverse the removal procedure.
Removing and replacing the primary or secondary PCIe riser cages
CAUTION: To prevent improper cooling and thermal damage, do not operate the server unless all PCI slots have
either an expansion slot cover or an expansion board installed.
Procedure
2. Remove all power:
a. Disconnect each power cord from the power source.
b. Disconnect each power cord from the server.
3. Disconnect any external cables that are connected to the expansion board.
4. Do one of the following:
Removal and replacement procedures
45
Содержание ProLiant DL385 Gen10
Страница 30: ...30 Customer self repair...
Страница 31: ...Customer self repair 31...
Страница 32: ...32 Customer self repair...
Страница 129: ...8LFF front panel 12LFF front panel Midplane box LFF only Component identification 129...
Страница 141: ...Rear 2SFF to system board Cable routing Front 8SFF SAS SATA drive options Box 1 to SAS Expander Cabling 141...
Страница 142: ...Boxes 2 and 3 to SAS Expander All boxes to SAS Expander 142 Cabling...
Страница 143: ...Cable routing Midplane 4LFF SAS SATA drive option Cabling 143...
Страница 145: ...Cable routing Rear 3LFF SAS SATA drive option for system board Cabling 145...
Страница 147: ...Cable routing Front 2SFF NVMe side by side drive options Cabling 147...
Страница 149: ...Cable routing Front 8SFF NVMe drive options Box 1 Box 2 Cabling 149...
Страница 150: ...Box 3 150 Cabling...
Страница 153: ...Cable routing Power switch module SID module An SFF model is shown The routing is the same for LFF Cabling 153...