2. At the rear of the server, plug in the power cord to the power supply.
3. Install the power cord anchors.
4. Secure the cables to the cable management arm.
IMPORTANT: Leave enough slack in each of the cables to prevent damage to the cables when the server is
extended from the rack.
5. Connect the power cord to the AC power source.
Release the cable management arm
Release the cable management arm and then swing the arm away from the rack.
Operations
50
Содержание ProLiant DL380 Gen10
Страница 33: ...Component identification 33...
Страница 58: ...Operations 58...
Страница 116: ...7 Install the drive cage compatible rear wall 8 Install the drive cage Hardware options installation 116...
Страница 124: ...7 Install the rear blank from the option kit Hardware options installation 124...
Страница 163: ...Box 1 to SAS Expander Box 2 to SAS Expander Cabling 163...
Страница 165: ...Box 1 Box 2 Cabling 165...
Страница 166: ...Box 3 Cable routing Front 2SFF NVMe drive option for SFF Cable routing Front 2SFF NVMe drive option for LFF Cabling 166...
Страница 167: ...Cable routing Midplane 4LFF drive option Cabling 167...
Страница 173: ...Cabling 173...