52
preparing for installation,
cleanness,
cooling system,
electricity safety,
ESD prevention,
examing the installation site,
general satefy recommendations,
lightning protection,
pre-installation checklist,
rack-mounting,
satefy symbols,
temperature and humidity,
procedure
configuring basic settings for router,
connecting AC power cord,
connecting router,
displaying boot information,
grounding router through rack,
grounding router with buried grounding
conductor,
grounding router with grounding strip,
grounding the router,
installing router in rack,
,
installing router on workbench,
installing the router,
logging in through console port,
powering on the router,
replacing DSIC,
replacing SIC,
restoring factory settings,
setting console terminal parameters,
troubleshooting cable failure,
troubleshooting configuration system
failure,
troubleshooting connection failure,
troubleshooting fan failure,
troubleshooting garbled terminal display,
troubleshooting interface module failure,
troubleshooting no response from serial port,
troubleshooting no terminal display,
troubleshooting power supply failure,
R
rack
rack-mounting clearance requirements,
rack (router installation),
,
replacing
equipment components,
reset button
usage guidelines,
router
connecting to network,
S
safety
electricity safety,
general satefy recommendations,
installation recommendations,
lightning protection,
satefy symbols,
setting console terminal parameters,
SIC
replacing,
replacing DSIC,
site requirements
lightning protection,
rack-mounting,
T
technical specifications,