Preparing the
Preparing the compute module
compute module for operation
for operation
Procedure
Procedure
1. Install any options or cables previously removed to access the TPM connector.
2. Install the access panel.
3. Do one of the following:
Slide or install the server into the rack.
Install the compute module into the frame.
4. Power up the compute module.
a. Connect the power cords (rack and tower servers).
b. Press the Power On/Standby button.
Preparing the compute module for operation
98
Содержание Synergy 480 Gen10
Страница 6: ...Component identification Component identification 6 ...
Страница 10: ...Front panel LEDs and buttons 10 ...
Страница 15: ...Smart Carrier NVMe SCN drive LED definitions 15 ...
Страница 32: ...Operations Operations 32 ...
Страница 45: ...Setup Setup 45 ...
Страница 90: ...HPE Trusted Platform Module 2 0 Gen10 option HPE Trusted Platform Module 2 0 Gen10 option 90 ...
Страница 93: ...Installing and enabling the HPE TPM 2 0 Gen10 option Installing and enabling the HPE TPM 2 0 Gen10 option 93 ...
Страница 94: ...Installing the Trusted Platform Module board Installing the Trusted Platform Module board 94 ...
Страница 97: ...4 Proceed to Preparing the compute module for operation Installing the TPM board and cover 97 ...
Страница 103: ...Cabling Cabling 103 ...
Страница 105: ...Energy pack option cabling Energy pack option cabling 105 ...
Страница 108: ...Electrostatic discharge Electrostatic discharge 108 ...
Страница 111: ...Specifications Specifications 111 ...
Страница 118: ...Support and other resources Support and other resources 118 ...