General Information
25
Edge Switch 2/12 Service Manual
Figure 5: Null modem cable
Tools Supplied by Service Personnel
The following tools are expected to be supplied by service personnel performing
switch installation and maintenance actions. Use of the tools may be required to
perform one or more installation, test, service, or verification tasks.
■
Scissors or pocket knife–A sharp cutting edge (scissors or knife blade) may
be required to cut the protective strapping when unpacking the switch or
replacement FRUs.
■
Standard flat-tip and cross-tip (Phillips) screwdrivers–Screwdrivers are
required to remove, replace, adjust, or tighten various connector or chassis
components.
■
Maintenance terminal (desktop or notebook PC)–The PC is required to
configure switch network addresses and acquire event log information
through the maintenance port.
The PC must have:
— The Microsoft
®
Windows
®
98, Windows
2000, or Windows Millennium
Edition operating system installed.
— RS-232 serial communication software (such as ProComm Plus™ or
HyperTerminal) installed. HyperTerminal is provided with Windows
operating systems.
■
Fiber-optic cleaning kit–The kit contains tools and instructions to clean
fiber-optic cable, connectors, loopback plugs, and protective plugs.
Содержание StorageWorks Edge Switch 2/12
Страница 16: ...About this Guide 16 Edge Switch 2 12 Service Manual ...
Страница 124: ...Repair Information 124 Edge Switch 2 12 Service Manual ...
Страница 132: ...Illustrated Parts Breakdown 132 Edge Switch 2 12 Service Manual ...
Страница 172: ...Event Codes 172 Edge Switch 2 12 Service Manual ...