Repair Information
112
Edge Switch 2/12 Service Manual
Power-On Procedure
To power on the switch:
1. One alternating current (AC) power cord is required for the power supply.
Ensure a power cord is available to connect the switch to facility power.
WARNING:
An HP power cord is provided for the Edge Switch
2/12 power supply. To prevent electric shock when connecting
the switch to primary facility power, use only the supplied power
cord and ensure the facility power receptacle is the correct type,
supplies the required voltage, and is properly grounded.
2. Plug the power cord into a facility power source and power supply AC
connector at the rear of the switch. When the power cord is connected, the
switch powers on and performs power-on self-tests (POSTs).
3. During POSTs:
— The green power (PWR) LED on the switch front panel illuminates.
— The amber system error (ERR) LED on the switch front
panel blinks momentarily while the switch is tested.
— The green LED associated with the Ethernet port blinks momentarily
while the port is tested.
— The blue/green and amber LEDs associated with the ports blink
momentarily while the ports are tested.
4. After successful POST completion, the green power (PWR) LED remains
illuminated and all amber LEDs extinguish.
5. If a POST error or other malfunction occurs, go to “
on page 32 to isolate the problem.
Содержание StorageWorks Edge Switch 2/12
Страница 16: ...About this Guide 16 Edge Switch 2 12 Service Manual ...
Страница 124: ...Repair Information 124 Edge Switch 2 12 Service Manual ...
Страница 132: ...Illustrated Parts Breakdown 132 Edge Switch 2 12 Service Manual ...
Страница 172: ...Event Codes 172 Edge Switch 2 12 Service Manual ...