Removal and replacement procedures 61
o
If the server is in a tower configuration, return the server to an upright position.
o
If the server is in a rack configuration, slide the server into the rack.
5.
Connect each power cord to the server.
6.
Connect each power cord to the power source.
7.
Power up the server ("
8.
Do one of the following:
o
For tower models, install the tower bezel.
o
For rack models, install the security bezel.
For more information about battery replacement or proper disposal, contact an authorized reseller or an
authorized service provider.
SAS Expander card
To remove the component:
1.
Do one of the following:
o
For tower models, open and remove the tower bezel ("
o
For rack models, if installed, remove the security bezel ("
Remove the security bezel (optional)
on page
2.
Power down the server (on page
3.
Remove all power:
a.
Disconnect each power cord from the power source.
b.
Disconnect each power cord from the server.
4.
Do one of the following:
o
For tower models, place the server on a flat, level surface with the access panel facing up.
o
For rack models, extend the server from the rack (on page
5.
Remove the access panel ("
6.
Remove the air baffle (on page
7.
Remove the fan cage (on page
8.
Open the slot retainer cover.
Содержание ProLiant ML350 Gen9
Страница 5: ...Contents 5 Index 123 ...
Страница 13: ...Customer self repair 13 ...
Страница 14: ...Customer self repair 14 ...
Страница 15: ...Customer self repair 15 ...
Страница 18: ...Illustrated parts catalog 18 ...
Страница 64: ...Removal and replacement procedures 64 LFF configuration SFF configuration ...
Страница 91: ...Component identification 91 o Rack orientation 24 LFF drives o Tower orientation ...
Страница 104: ...Cabling 104 Storage controller installed in slot 1 to 4 Storage controller installed in slot 6 to 9 ...
Страница 105: ...Cabling 105 HPE Smart Storage Battery cabling Power supply backplane cabling GPU power cabling ...
Страница 109: ...Cabling 109 Embedded SATA cabling LFF configuration SFF configuration ...
Страница 112: ...Cabling 112 o SFF configuration o LFF configuration SAS Expander cabling One SAS Expander ...
Страница 113: ...Cabling 113 o LFF configuration o SFF configuration ...
Страница 114: ...Cabling 114 Two SAS Expanders Express bay cabling Express bay bridge card installed in PCIe slot 3 ...