
Operations 10
This method initiates a controlled shutdown of applications and the OS on any active nodes before
the cartridge enters standby mode.
o
If the cartridge is unresponsive, press and hold the cartridge power button for 4 seconds to initiate
a forced shutdown of any active nodes.
o
If the cartridge power LED is amber, the cartridge is in standby mode and no nodes are active. No
further action is required.
2.
Verify that the power is off by reviewing the status of the cartridge power LED.
For more information, see "Cartridge LEDs and buttons (on page
)."
Extend the chassis from the rack
1.
Pull down the quick release levers on each side of the chassis.
WARNING:
To reduce the risk of personal injury or equipment damage, be sure that the rack is
adequately stabilized before extending a component from the rack.
2.
Extend the chassis from the rack until it locks once.
3.
Press the push tab on the rail, and then fully extend the chassis.
WARNING:
To reduce the risk of personal injury, be careful when pressing the server rail-release
latches and sliding the server into the rack. The sliding rails could pinch your fingers.