
Hardware options installation 24
4.
Attach the server to the cradle:
a.
Insert the two hooks on the right side of the cradle into the corresponding openings on the bottom
of the server.
b.
Align and insert the two posts on the cradle into the corresponding openings on the bottom of the
server.
c.
Close the latches on the cradle.
Installing the server in the wall mount
Required tools:
•
Stud finder (if installing the wall mount on a hollow wall)
•
Wall marker
•
Level
•
Electric drill
•
Small wire brush (for cleaning the pilot holes)
•
No. 2 Phillips screwdriver
•
Hammer
Process overview:
1.
Determine the location for the wall mount (on page
2.
Prepare the server for hardware installation or removal (on page
3.
If the server is installed in a cradle or on a storage expansion unit:
o
Remove the server from the cradle (on page
o
Remove the server from the storage expansion unit (on page
4.
Install the wall mount (on page
5.
Install the server in the wall mount (on page
6.
Prepare the server for operation (on page
Содержание ProLiant EC200a
Страница 13: ...Component identification 13 Fan location in the storage expansion unit ...
Страница 43: ...Cabling 43 Fan cabling Ambient temperature sensor cabling ...
Страница 65: ...Support and other resources 65 ...
Страница 66: ...Support and other resources 66 ...
Страница 67: ...Support and other resources 67 ...