Removal and replacement procedures
Required tools
You need the following items for some procedures:
• T-10 Torx screwdriver
• T-15 Torx screwdriver
• T-30 Torx screwdriver
Safety considerations
Before performing service procedures, review all the safety information.
Preventing electrostatic discharge
To prevent damaging the system, be aware of the precautions you must follow when setting up the system or
handling parts. A discharge of static electricity from a finger or other conductor may damage system boards or
other static-sensitive devices. This type of damage may reduce the life expectancy of the device.
Procedure
• Avoid hand contact by transporting and storing products in static-safe containers.
• Keep electrostatic-sensitive parts in their containers until they arrive at static-free workstations.
• Place parts on a grounded surface before removing them from their containers.
• Avoid touching pins, leads, or circuitry.
• Always be properly grounded when touching a static-sensitive component or assembly.
Symbols on equipment
The following symbols might be found on the equipment to indicate the presence of potentially hazardous
conditions.
This symbol indicates the presence of hazardous energy circuits or electric shock
hazards. Refer all servicing to qualified personnel.
WARNING:
To reduce the risk of injury from electric shock hazards, do not open this
enclosure. Refer all maintenance, upgrades, and servicing to qualified personnel.
This symbol indicates the presence of electric shock hazards. The area contains no user
or field serviceable parts. Do not open for any reason.
WARNING:
To reduce the risk of injury from electric shock hazards, do not open this
enclosure.
Removal and replacement procedures
31
Содержание ProLiant DL560 Gen10
Страница 6: ...Warranty information 124 Regulatory information 125 Documentation feedback 125 6 Contents ...
Страница 27: ...Customer self repair 27 ...
Страница 28: ...28 Customer self repair ...
Страница 29: ...Customer self repair 29 ...
Страница 30: ...30 Customer self repair ...
Страница 79: ...Eight bay SFF NVMe drive cage Two bay NVMe Six bay SFF HDD drive cage Component identification 79 ...
Страница 102: ...16 SFF backplanes Group C SAS cables 102 Cabling ...
Страница 104: ...Connected to the secondary PCIe riser board Connected to the tertiary PCIe riser board 104 Cabling ...
Страница 105: ...Connected to the system board SATA ports 1 and 2 Connected to the HPE P816i a Smart Array controller Cabling 105 ...
Страница 107: ...Connected to the secondary PCIe riser board Connected to the tertiary PCIe riser board Cabling 107 ...
Страница 108: ...Connected to the system board SATA ports 1 and 2 Connected to the Smart Array controller 108 Cabling ...
Страница 109: ...Drive box 3 cabling Connected to the Primary PCIe riser board Connected to the secondary PCIe riser board Cabling 109 ...
Страница 110: ...Connected to the system board SATA ports 1 and 2 Connected to an HPE Smart Array controller 110 Cabling ...
Страница 113: ...Quad slimline riser installed in the secondary PCIe riser cage Tertiary riser Cabling 113 ...