Diagnostic tools and setup utilities 111
If the POST failure is during a routine boot up, check the following:
•
All external cables and power cables should be firmly plugged in.
•
The power outlet to the server should be connected and works correctly.
•
The server and monitor are both turned on. The bicolour status LED indicator on the front panel
must be lit up green.
•
The monitor's contrast and brightness settings are correct.
•
All internal cables are properly connected and all boards firmly seated.
•
The processor is fully seated in its socket on the system board.
•
The heat sink assembly is properly installed on top of the processor.
•
All memory modules are properly installed.
•
If you have installed a PCI accessory board, verify that the board is firmly seated and any
jumpers on the board are properly set. Refer to the documentation provided with the accessory
board.
•
All internal cabling and connections are in their proper order.
•
If you have changed the jumpers on the system board, verify that each is properly set.
SETSYS utility
SETSYS.EXE (DOS application) is the correct tool for setting the Serial Number/Asset Tag text on this
server after a system board replacement has occurred.
Once the Serial Number/Asset Tag text has been entered via SETSYS, populating the SMBIOS data,
the system BIOS will automatically write this info into the BMC IPMI FRU data on the next boot up.
Содержание ProLiant DL160se - G6 Server
Страница 12: ...Customer self repair 12 ...
Страница 13: ...Customer self repair 13 ...
Страница 14: ...Customer self repair 14 ...
Страница 15: ...Customer self repair 15 ...
Страница 20: ...Illustrated parts catalog 20 ...
Страница 55: ...Removal and replacement procedures 55 Figure 31 Reinstalling the Backplane 3 Install all cables ...