Hardware options installation 35
11.
Press down on the cable connector to fully seat the Smart Storage Battery cable connector to the
system board.
12.
If removed, install the direct connect SATA cable ("
Install the direct connect SATA cable
" on page
13.
If removed, install the internal USB drive. To locate the internal USB connector, see "System board
components (on page
)."
14.
Install the access panel (on page
15.
Install the server blade (on page
16.
Power up the server blade (on page
Mezzanine card option
Optional mezzanine cards are classified as Type A mezzanine cards and Type B mezzanine cards. The
type of the mezzanine card determines where it can be installed in the server blade.
•
Install Type A mezzanine cards on Mezzanine 1 connector or Mezzanine 2 connector.
•
Install Type B mezzanine cards on Mezzanine 2 connector.
Optional mezzanine cards enable network connectivity or provide Fiber Channel support. For mezzanine
card locations, see "System board components (on page
)."
When installing a mezzanine option on mezzanine connector 2, processor 2 must be installed.
For mezzanine card mapping, see "Interconnect bay numbering and device mapping (on page
)."
To install the component:
1.
Power down the server blade (on page
2.
Remove the server blade (on page
3.
Place the server blade on a flat, level work surface.
4.
Remove the access panel (on page
Содержание ProLiant BL460c Gen9
Страница 82: ...Support and other resources 82 ...
Страница 83: ...Support and other resources 83 ...