10-1
Pl
an
n
ing
an
d
Imp
le
m
e
n
ta
tio
n
fo
r th
e
5400z
l/8200z
l Switche
s
10
Planning and Implementation for the
5400zl/8200zl Switches
This chapter discusses the planning process a user should follow to
successfully implement PoE or PoE+ on 5400zl/8200zl switches. The 5412zl
chassis and the 8212zl chassis share a common PoE/PoE+ implementation,
and the 5406zl chassis and the 8206zl chassis share a common PoE/PoE+
implementation. Port counts, power supply wattages, specifications, and
functionality for these two platforms are the same with respect to PoE and
PoE+.
After understanding what PoE is and its operating rules, the next step to
implementation is planning. See
“General Considerations” page A-1,
for an
example list of considerations during the planning phase.
Содержание ProCurve 600
Страница 1: ...Power over Ethernet HP ProCurve Power over Ethernet PoE PoE Planning and Implementation Guide ...
Страница 2: ......
Страница 3: ...Power over Ethernet PoE PoE Planning and Implementation Guide ...
Страница 42: ......
Страница 66: ......
Страница 70: ......
Страница 80: ......
Страница 90: ......
Страница 102: ......
Страница 120: ......
Страница 152: ......
Страница 156: ......
Страница 165: ...Index 3 Index system power 5412zl 8212zl 10 5 10 6 T threshold configuing global 2 6 configuring per slot 2 6 ...
Страница 166: ......
Страница 167: ......