2-7
Installing the Switch 408
Installation Procedures
When the switch is powered on, it performs its diagnostic self
test. The self test takes approximately 3 seconds to complete.
LED Behavior:
During the self test:
•
All the switch and port LEDs are on.
When the self test completes successfully:
•
The Power LED stays on and the Fault LED goes off.
•
The port LEDs (Link/Act, FDx, and 100) go into their normal
operational mode.
If the LED display is different than what is described above,
especially if the Fault LED stays on for more than 5 seconds, the
self test has not completed correctly. Refer to chapter 3, “Trou-
bleshooting” for diagnostic help.
C
Switch port LEDs
Power and Fault LEDs
Содержание ProCurve 408
Страница 1: ...Installation Guide www procurve com ProCurve Switch 408 ...
Страница 2: ......
Страница 3: ...ProCurve Switch 408 Installation Guide ...
Страница 8: ... This page is intentionally unused ...
Страница 45: ...C 7 Safety and Regulatory Statements Safety Information Japan Safety Information Japan WAR NIN G ...
Страница 46: ...C 8 Safety and Regulatory Statements Safety Information China Safety Information China ...
Страница 48: ...C 10 Safety and Regulatory Statements EMC Regulatory Statements Japan VCCI Class A Korea Taiwan ...
Страница 51: ...D 1 D Recycle Statements Waste Electrical and Electronic Equipment WEEE Statements ...
Страница 61: ... This page is intentionally unused ...
Страница 62: ... This page is intentionally unused ...
Страница 63: ......