Installing Hardware Options
3-12
HP ProLiant ML530 Generation 2 Server Setup and Installation Guide
HP CONFIDENTIAL
Writer: Richard O. Heath File Name: d-ch3 Installing Hardware Options.doc
Codename: Seattle Slew Part Number: 225579-002 Last Saved On: 1/8/03 3:00 PM
Opening the Hot-Plug Door
To open the hot-plug door:
1.
For tower-model servers only, lock the casters at the base of the server and gently
tilt the server onto the side opposite the access panel to facilitate access to
internal components.
2.
For rack-model servers already installed in a rack, complete the following steps
to lock the server into the fully extended position:
a.
Loosen the front panel thumbscrews to release the server from the rack.
b.
Extend the server from rack until it stops.
3.
Locate the hot-plug door key. The key is located inside the front bezel door on
tower-model servers (1), or in a bag attached to the rear handle on rack-model
servers (2).
Figure 3-7: Locating the hot-plug door key