Server warnings and cautions
•
Server shipping contents
Optimum Environment
When installing the HP ProLiant ML530 Generation 2 server in a rack, select a
location that meets the environmental standards described in the following sections.
Information is available for optional rack adapter kits to install your server in a telco
or third-party rack. Complete instructions for using adapter kits to install your server
in a rack are included with each option kit.
•
For information about obtaining rack option kits for third-party racks, refer to the
HP website:
www.hp.com/servers/proliant
•
For information about installing your server in a telco rack, refer to the following
website:
www.racksolutions.com/hp
Space and Airflow Requirements
To enable servicing and adequate airflow, observe the following spatial requirements
when deciding where to install your Compaq branded or third-party rack:
•
Leave a minimum clearance of 63.5 cm (25 inches) in front of the rack.
•
Leave a minimum clearance of 76.2 cm (30 inches) in the back of the rack.
•
Leave a minimum clearance of 121.9 cm (48 inches) from the back of the rack to
the rear of another rack or row of racks.