Installing Hardware Options
3-72
HP ProLiant ML530 Generation 2 Server Setup and Installation Guide
HP CONFIDENTIAL
Writer: Richard O. Heath File Name: d-ch3 Installing Hardware Options.doc
Codename: Seattle Slew Part Number: 225579-002 Last Saved On: 1/8/03 3:00 PM
5.
Connect the power and signal cables to the DVD drive. Refer to the
documentation that ships with the option kit for directions on cabling the DVD
drive. For internal cabling information specific to DVD drive installation in the
ProLiant ML530 Generation 2 server, see Chapter 7, “Cabling the Server.”
Figure 3-60: Cabling a DVD drive from the CD-ROM
drive bay to the primary IDE connector on the system
board
6.
Reinstall the drive air baffle and tighten the thumbscrews.
7.
Reinstall the CPU and I/O fan baskets and tighten the thumbscrews.
8.
Reinstall the CPU and I/O fans.
9.
Close the system tray.
10.
Reinstall the access panel.
11.
Install the server. See Chapter 5, “Installing the Rack Server” or Chapter 6,
“Installing the Tower Server.”
12.
Power up the server. See Chapter 5, “Installing the Rack Server” or Chapter 6,
“Installing the Tower Server.”