Installing Hardware Options
HP ProLiant ML530 Generation 2 Server Setup and Installation Guide
3-63
HP CONFIDENTIAL
Writer: Richard O. Heath File Name: d-ch3 Installing Hardware Options.doc
Codename: Seattle Slew Part Number: 225579-002 Last Saved On: 1/8/03 3:00 PM
9.
Slide the device into the removable media drive bay until the release latch locks
into place.
Figure 3-51: Installing a SCSI or IDE device in the
removable media bays (tower model)
10.
Cable the power and signal cables for your SCSI or IDE device. See “Cabling
SCSI Devices in the Removable Media Bay” or “Cabling IDE Devices in the
Removable Media Bay” in this chapter.
11.
Reinstall the access panel.
12.
If you have a tower-model server, close the front bezel door.
13.
Install the server. See Chapter 5, “Installing the Rack Server” or Chapter 6,
“Installing the Tower Server.”
14.
Power up the server. See Chapter 5, “Installing the Rack Server” or Chapter 6,
“Installing the Tower Server.”
15.
Be sure that the LED on the front of the SCSI or IDE device is illuminated green,
indicating that the system is functioning properly. For detailed information on
LEDs, see Appendix C, “System LEDs and Switches.”
16.
If any of the LEDs indicates an error, see Appendix D, “Troubleshooting,” or
refer to the troubleshooting guide for instructions.
For more information about installing and configuring SCSI or IDE devices in the
removable media bays, refer to the documentation that ships with the option kit.