2-6
Installing the Switch
Installation Procedures
2. Verify the Switch Passes Self Test
Before mounting the switch in its network location, you should first verify it
is working properly by plugging it into a power source and verifying it passes
its self test.
1.
Connect the AC/DC adapter’s power cord to the power connector on the
back of the switch, and then plug the AC/DC power adapter into a nearby
properly grounded electrical outlet.
N o t e
The switches are shipped with one of two types of AC/DC power adapter;
either the universal AC/DC adapter with an AC power cord, or the wall plug-
in AC/DC adapter (without an AC power cord).
Figure 2-1. Connecting the switch power adapter
Connect the wall plug-in AC/DC
power adapter to the switch and
an AC power outlet
Connect the universal AC/DC
power adapter to the switch
and an AC power outlet
V1410-8 Switch
V1410-16 Switch
Содержание J9661A
Страница 2: ......
Страница 3: ...HP V1410 Switch Series Installation and Getting Started Guide ...
Страница 7: ...v Contents Australia New Zealand B 1 Japan B 2 Korea B 2 Taiwan B 2 European Community B 3 Index ...
Страница 8: ...vi Contents ...
Страница 34: ...2 20 Installing the Switch Sample Network Topologies ...
Страница 50: ...B 2 EMC Regulatory Statements Regulatory Statements Japan VCCI Class A Korea Taiwan ...
Страница 58: ...4 Index ...