
Preinstallation worksheets 18
Item
Username
Password
vCenter Server (local)
[email protected] HyperConv!234
HC380 Management VM
administrator
HyperConv!234
ESXi shell
root
HyperConv!234
iLO administrator
CloudSystem Operations
Console
admin
unset
OpenStack Horizon Console admin
unset
CloudSystem Management
Appliances
cloudadmin
cloudadmin
CSA MarketPlace Portal
consumer
cloud
Operations Orchestration
administrator
unset
For more information about iLO, see "HPE iLO 4 (on page
)."
CloudSystem
Use the following worksheet to assist in the pre-planning for the CloudSystem workload configuration. If
you are installing the general virtualization or VDI workload configurations, you can skip this spreadsheet.
While the Block and Object networks are not used, the installation process requires a VLAN for each
network. Assign two unused VLAN IDs for these networks that do not interfere with any of your other
networks.
For more information, see "Appendix E: CloudSystem Network Diagram (on page
)."
Item
Value
Data Center Management Network
DCM IP Range: (25 contiguous IPs)
DCM VLAN ID:
DCM CIDR:
DCM Gateway:
DCM Management Appliance VIP:
DCM Management Appliance FQDN:
DCM Cloud Controller VIP:
DCM Cloud Controller FQDN:
DCM Enterprise Appliance VIP:
DCM Enterprise Appliance FQDN:
Cloud Management Network
CLM VLAN ID:
Consumer Access Network
CAN IP Range: (+3 contiguous IPs)
CAN VLAN ID:
CAN CIDR:
CAN Gateway:
CAN Cloud Controller VIP:
CAN Cloud Controller FQDN:
CAN Enterprise Appliance VIP:
CAN Enterprise Appliance FQDN: