HPE 800 W Flex Slot -48 VDC Hot-plug Low Halogen Power Supply
800 W Flex Slot -48 VDC Hot-plug Low Halogen Power Supply
Specification
Specification
Value
Value
Input requirements
Input requirements
—
Rated input voltage
-40 VDC to -72 VDC
-48 VDC nominal input
Rated input current
22.1 A at -40 VDC input
18.2 A at -48 VDC input, nominal input
12.0 A at -72 VDC input
Rated input power (W)
874 W at -40 VDC input
865 W at -48 VDC input, nominal input
854 W at -72 VDC input
Rated input power (BTUs per hour)
2983 at -40 VDC input
2951 at -48 VDC input, nominal input
2912 at -72 VDC input
Power supply output
Power supply output
—
Rated steady-state power (W)
800 W at -40 VDC to -72 VDC
Maximum peak power (W)
800 W at -40 VDC to -72 VDC
Maximum peak power
800 W at -40 VDC to -72 VDC input
WARNING:
WARNING: To reduce the risk of electric shock or energy hazards:
This equipment must be installed by trained service personnel.
Connect the equipment to a reliably grounded secondary circuit source. A secondary circuit
has no direct connection to a primary circuit and derives its power from a transformer,
converter, or equivalent isolation device.
The branch circuit overcurrent protection must be rated 27 A.
CAUTION:
CAUTION: This equipment is designed to permit the connection of the earthed conductor of the DC supply circuit to the
earthing conductor at the equipment.
If this connection is made, all of the following must be met:
This equipment must be connected directly to the DC supply system earthing electrode conductor or to a bonding
jumper from an earthing terminal bar or bus to which the DC supply system earthing electrode conductor is
connected.
This equipment must be located in the same immediate area (such as adjacent cabinets) as any other equipment
that has a connection between the earthed conductor of the same DC supply circuit and the earthing conductor, and
also the point of earthing of the DC system. The DC system must be earthed elsewhere.
The DC supply source is to be located within the same premises as the equipment.
Switching or disconnecting devices must not be in the earthed circuit conductor between the DC source and the
point of connection of the earthing electrode conductor.
HPE 800 W Flex Slot -48 VDC Hot-plug Low Halogen Power Supply
212
Содержание HPE ProLiant DL365 Gen10 Plus Server
Страница 7: ...10 5 Regulatory information 10 6 Documentation feedback ...
Страница 8: ...Component identification Component identification 8 ...
Страница 24: ...Device numbers 8 SFF device bay numbering 8 SFF 2 SFF device bay numbering Device numbers 24 ...
Страница 25: ...Drives Drives 25 ...
Страница 29: ...Fan bay numbering Fan bay numbering 29 ...
Страница 30: ...Operations Operations 30 ...
Страница 45: ...Setup Setup 45 ...
Страница 62: ...Hardware options installation Hardware options installation 62 ...
Страница 78: ...Installing an 8 SFF optical drive 78 ...
Страница 79: ...Universal media bay options Universal media bay options 79 ...
Страница 97: ...Secondary PCI riser options Secondary PCI riser options 97 ...
Страница 104: ...Full length Installing an expansion board in the secondary riser cage 104 ...
Страница 118: ...Installing an HPE Smart Array P816i a SR Gen10 Controller option 118 ...
Страница 119: ...Processor and heatsink options Processor and heatsink options 119 ...
Страница 143: ...HPE Trusted Platform Module 2 0 Gen10 Plus option HPE Trusted Platform Module 2 0 Gen10 Plus option 143 ...
Страница 146: ...Installing and enabling the HPE TPM 2 0 Gen10 Plus option Installing and enabling the HPE TPM 2 0 Gen10 Plus option 146 ...
Страница 147: ...Installing the Trusted Platform Module board Installing the Trusted Platform Module board 147 ...
Страница 156: ...Software and configuration utilities Software and configuration utilities 156 ...
Страница 185: ...Keeping the system current Keeping the system current 185 ...
Страница 198: ...Troubleshooting Troubleshooting 198 ...
Страница 200: ...Cabling Cabling 200 ...
Страница 217: ...Support and other resources Support and other resources 217 ...