![HP G2 Series Скачать руководство пользователя страница 69](http://html.mh-extra.com/html/hp/g2-series/g2-series_installation-manual_161557069.webp)
Heavy Duty Stabilizer kit
Kit overview
The Heavy Duty Stabilizer kit provides stability and support and prevents possible tipping when you install, remove, or access
equipment within the HPE Advanced G2 Series or HPE Enterprise G2 Series racks.
Use the heavy duty stabilizer kit if you have a stand-alone rack with a single rack-mountable component that exceeds 99.8 kg
(220 lb) or if you have three or fewer bayed racks with a single rack-mountable component that exceeds 99.8 kg (220 lb).
NOTE: This kit is only available for 600mm wide racks.
Kit contents (BW961A)
Item
Quantity
Heavy duty front stabilizer mount
1
Heavy duty stabilizer feet
2
M8 x 16-mm bolt
8
M8 x 30-mm bolt
2
M8 flat washer
10
Required tools
The following tools are required for installation:
• Ratchet with sockets
• Adjustable wrench
Installing the heavy duty stabilizer
Procedure
1. Install the front stabilizer mount.
a. Align the front stabilizer mount to the mounting holes on the rack front caster plate.
b. Insert and partially tighten four M8 x16-mm bolts with washers, securing the front stabilizer mount to the front caster
plate.
Heavy Duty Stabilizer kit
69
Содержание G2 Series
Страница 16: ...Ballast kit 16 ...
Страница 19: ...5 Re attach the front and rear doors Baying kits 19 ...
Страница 26: ...Cable Management Combo kit 26 ...
Страница 29: ...Rack Roof Mount Fan kit 29 ...
Страница 42: ...Hook and Loop Cabling Strap Clip kit 42 ...
Страница 43: ...Hook and Loop Cabling Strap Clip kit 43 ...
Страница 45: ...4 Bundle rack cables as required 1 4 Turn Hook and Loop Cabling Strap kit 45 ...
Страница 57: ...Server Utility Shelf kit 57 ...
Страница 65: ...Side Panel kit 65 ...
Страница 68: ...5 Tighten the bolts from steps 2 and 4 Stabilizer kit 68 ...
Страница 74: ...800 mm rack Universal Rack Tie down kit 74 ...