Hardware options installation 52
Drive installation guidelines
When adding drives to the server, observe the following general guidelines:
•
The system automatically sets all device numbers.
•
Populate drive bays, based on the drive numbering sequence. Start from the drive bay with the
lowest device number ("
•
All drives grouped into the same drive array must meet the following criteria:
o
They must be either all SAS or all SATA.
o
They must be either all hard drives or all solid state drives.
o
Drives should be the same capacity to provide the greatest storage space efficiency when drives
are grouped together into the same drive array.
Installing a hot-plug drive in the front drive cage 1
CAUTION:
Do not operate the server with any of the front drive cage 1 bays empty. To
maintain proper airflow and sufficient cooling in the front drive cage 1, all drive bays in this cage
should have a drive or a drive blank.
To install the component:
1.
If installed, remove the security bezel (on page
2.
Remove the drive blank:
o
LFF drive blank
o
SFF drive blank
3.
Open the drive release lever:
Содержание Apollo 4200 Gen9
Страница 38: ...Operations 38 o Two bay SFF hot plug rear drive cage removal o Six bay SFF hot plug rear drive cage removal ...
Страница 154: ...Cabling 154 Front panel cabling Item Description 1 Front I O cable 2 Front USB 2 0 cable ...
Страница 182: ...Support and other resources 182 ...
Страница 183: ...Support and other resources 183 ...