Setup 39
Setup
Optional services
Delivered by experienced, certified engineers, HPE support services help you keep your servers up and
running with support packages tailored specifically for HPE ProLiant systems. HPE support services let
you integrate both hardware and software support into a single package. A number of service level
options are available to meet your business and IT needs.
HPE support services offer upgraded service levels to expand the standard product warranty with
easy-to-buy, easy-to-use support packages that will help you make the most of your server investments.
Some of the HPE support services for hardware, software or both are:
•
Foundation Care – Keep systems running.
o
6-Hour Call-to-Repair
o
4-Hour 24x7
o
Next Business Day
•
Proactive Care – Help prevent service incidents and get you to technical experts when there is one.
o
6-Hour Call-to-Repair
o
4-Hour 24x7
o
Next Business Day
•
Startup and implementation services for both hardware and software
•
HPE Education Services – Help train your IT staff.
For more information on HPE support services, see the Hewlett Packard Enterprise website
Optimum environment
When installing the server in a rack, select a location that meets the environmental standards described in
this section.
Space and airflow requirements
To allow for servicing and adequate airflow, observe the following space and airflow requirements when
deciding where to install a rack:
•
Leave a minimum clearance of 63.5 cm (25 in) in front of the rack.
•
Leave a minimum clearance of 76.2 cm (30 in) behind the rack.
•
Leave a minimum clearance of 121.9 cm (48 in) from the back of the rack to the back of another rack
or row of racks.
Hewlett Packard Enterprise servers draw in cool air through the front door and expel warm air through the
rear door. Therefore, the front and rear rack doors must be adequately ventilated to allow ambient room
air to enter the cabinet, and the rear door must be adequately ventilated to allow the warm air to escape
from the cabinet.
Содержание Apollo 4200 Gen9
Страница 38: ...Operations 38 o Two bay SFF hot plug rear drive cage removal o Six bay SFF hot plug rear drive cage removal ...
Страница 154: ...Cabling 154 Front panel cabling Item Description 1 Front I O cable 2 Front USB 2 0 cable ...
Страница 182: ...Support and other resources 182 ...
Страница 183: ...Support and other resources 183 ...