
17.
Connect the Accelerator 2 power cable to Accelerator 2.
18.
Connect the Accelerator 1 power cable to the Accelerator 2 power cable.
19.
Install the riser cage bracket.
20.
Connect the power cable to the bayonet board.
For more information, see "
21. Install the three-slot riser cage assembly
22. Install the node into the chassis
.
23.
Connect all peripheral cables to the node.
Installing NVIDIA Tesla P40 and P100 GPUs and bezel blanks
CAUTION:
If NVIDIA Tesla P100 GPUs are installed in the server node, and the server node is installed in the HPE
Apollo r2200 Chassis, the inlet ambient temperature must be maintained at or below 24°C (75.2°F).
144
Installing NVIDIA Tesla P40 and P100 GPUs and bezel blanks
Содержание Apollo 2000 System
Страница 50: ... 1U left rear I O blank 2U rear I O blank 50 Operations ...
Страница 123: ... AMD FirePro S9150 GPU NVIDIA Quadro K4200 GPU or NVIDIA Quadro M4000 GPU Hardware options installation 123 ...
Страница 130: ... AMD FirePro S9150 GPU 11 Install Accelerator 1 into slot 3 AMD FirePro S7150 GPU 130 Hardware options installation ...
Страница 134: ...AMD FirePro S9150 19 Install Accelerator 2 into slot 4 AMD FirePro S7150 GPU 134 Hardware options installation ...