![HP AA-RS2WC-TE Скачать руководство пользователя страница 37](http://html.mh-extra.com/html/hp/aa-rs2wc-te/aa-rs2wc-te_installation-manual_165815037.webp)
Installing and Configuring the Core Switch 2/64
37
Core Switch 2/64 V4.1 Installation Guide
Installation and Safety Considerations
WARNING:
For safety reasons, when installing this product in an equipment
rack, you must consider rack stability against tipping. Please refer to the user
manual provided with the equipment rack to determine rack stability
(available through the HP Web site at:
http://www.hp.com/racksolutions/prodinfo/racks/index.html
If the necessary stability is not achieved, through the placement of additional
equipment or ballast, the equipment rack must be anchored to the building
structure before operation.
WARNING:
A fully populated HP StorageWorks Core Switch 2/64 weighs
approximately 250 pounds (113 kg) and requires a minimum of two people
and mechanical lift to install it.
Before installing, verify that the additional weight of the chassis does not
exceed the cabinet’s weight limits or unbalance the cabinet, including when
some of the cards or power supplies are partially extended out of the chassis.
Caution:
To ensure adequate cooling, install the chassis with the port side
facing the aisle into which exhaust air is released (usually called the service
aisle). This prevents the fans from pulling in heated exhaust air.
You must complete the following steps to ensure correct installation and
operation:
■
Provide a space that is 14U high, 29 inches deep, and 19 inches wide
(IU = 1.75 inches). Also provide an additional 1U for cable management.
■
If installing in a cabinet:
— Ensure the space in the 19 inch (48.3 cm) EIA cabinet is 14U high, with a
minimum distance of 28.25 inches (71.76 cm) between the front and back
rails, and a maximum distance of 29.88 inches (75.90 cm).
— Verify that the additional weight of the chassis does not exceed the
cabinet’s weight limits.
— Ensure that all equipment installed in the cabinet is grounded through a
reliable branch circuit connection. Do not rely on a secondary connection
to a branch circuit, such as a power strip.
Содержание AA-RS2WC-TE
Страница 12: ...Contents 12 Core Switch 2 64 V4 1 Installation Guide ...
Страница 34: ...Overview 34 Core Switch 2 64 V4 1 Installation Guide ...
Страница 88: ...Installing and Configuring the Core Switch 2 64 88 Core Switch 2 64 V4 1 Installation Guide ...
Страница 168: ...Running Routine Operations 168 Core Switch 2 64 V4 1 Installation Guide ...
Страница 198: ...Technical Specifications 198 Core Switch 2 64 V4 1 Installation Guide ...
Страница 206: ...Regulatory Compliance Notices 206 Core Switch 2 64 V4 1 Installation Guide Taiwanese Notice BSMI EMC Statement Taiwan ...
Страница 207: ...Regulatory Compliance Notices 207 Core Switch 2 64 V4 1 Installation Guide RRL EMC Statement Korea ...
Страница 224: ...Setting Up and Configuring Modems 224 Core Switch 2 64 V4 1 Installation Guide ...