Periodic maintenance 63
Periodic maintenance
Periodic maintenance overview
Perform periodic inspections on the components in this section to ensure that the HP POD 40c G2 continues
to perform within the designed parameters.
Cooling system maintenance schedule
Component to be inspected
Task
Frequency
Capable Party
Air filters
Inspect and replace as necessary As needed
HP and certified
facilities personnel
Air filter differential pressure
switch
Inspect and test, replace as
necessary
Annually
HP and certified
facilities personnel
Condensate drain lines and
p-trap
Inspect and clean or blowout
p-trap and lines as necessary
Quarterly
HP and certified
facilities personnel
Condensate drain pans
Inspect pans:
•
Free of debris
•
No leaks
•
Leakage detectors are in
proper position
•
Drain line is open
•
Water can pass through freely
•
Condensate traps are filled
with water
Clean pans as necessary
Quarterly
HP and certified
facilities personnel
Drain pan sensors
Inspect and test, replace as
necessary
If a leak is detected, see "Leak
detection maintenance (on page
Quarterly
HP and certified
facilities personnel
Conduct visual inspection for
leakage during the air filter
checks
Inspect and clean as necessary
Quarterly
HP and certified
facilities personnel
Heat exchanger fans
Inspect wiring and verify that
electrical components are secure
and fan power supplies are locked
into position
Quarterly
HP and certified
facilities personnel
Humidifier (if installed)
Inspect for water leaks, verify that
no sparks form between the
electrodes during operation, and
inspect the general operation of
the cylinder.
Bi-weekly
HP and certified
facilities personnel
—
Put the humidifier in system flush
mode and inspect drain flow and
water supply flow. Inspect, clean,
and/or replace as necessary.
Quarterly
HP and certified
facilities personnel